Laserfiche WebLink
, E <br /> , <br /> City of Orono <br /> _ _ _ 2750 Kelley Parkway <br /> P.O. Box 66,Crystal Bay,MN 55323 f <br /> 952-249-4600 <br /> Decks <br /> Buildin�Permits are required for any deck or patio. <br /> Frost Footin�s are required for any deck that is attached to a dewelling or gazage that has a frost <br /> footings. <br /> Guardrails-All decks that are 30" or more above grade must be protected by a guardrail. Such rail <br /> sha11 be 36" minimum in height. Open guardrails and stair railings shall have intermediate rails or <br /> an omamental pattern such that a 4" diameter sphere cannot pass through. <br /> Overhangin�Decks -Joists should not overhang beams by more than two feet, nor should beams <br /> overhang posts by more than one foot unless a special design is approved. <br /> Stairwav-If a stairway is to be provided, it shall be not less than 36 inches in width. 8"maximum <br /> rise- 9" minim�m run- 6'8" minimum headroom. <br /> Handrails-Handrails shall be provided to all stairways having 4 or more risers(private residential <br /> only). See page 5 for more information. <br /> Live Load-All decks shall be designed to support a live load of 60 pounds per square foot. <br /> Flashins -All connections between deck and dwelling shall be weatherproof. Any cuts in exterior <br /> finish shall be flashed or caulked. <br /> Joist Hangers - Header joists more than six feet long and tail joists over 12 feet long shall be <br /> supported by approved framing anchors such as joist hangers. <br /> Wood Required-.All exposed wood used in the construction of decks is required to be of approved <br /> wood of natural resistance to decay(redwood,cedar,ect.)or approved treated wood.This includes <br /> posts,beams,joists, and decking. <br /> Special Desi n Note-Some deck designs may not be appropriate should the placement of a screen <br /> porch or 3-season porch on the deck platform be a future consideration.Porch setback requirements <br /> are not the same as deck setbacks. <br /> Required Insnections: <br /> 1. Footin�s -After holes are dug,but prior to pouring of concrete. <br /> 2. Framin - Prior to laying decking. Framing inspection may be done when <br /> deck is complete if deck is not enclosed underneath. <br /> 3. Final - When deck is completed. <br />