My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-P12094 - stairweay to lake
Orono
>
Property Files
>
Street Address
>
P
>
Park Lane
>
577 Park Lane - 06-117-23-41-0046
>
Permits/Inspections
>
2008-P12094 - stairweay to lake
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:55 PM
Creation date
6/14/2018 1:36:34 PM
Metadata
Fields
Template:
x Address Old
House Number
577
Street Name
Park
Street Type
Lane
Address
577 Park La
Document Type
Permits/Inspections
PIN
0611723410046
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , ��w�3 �,��2�- �Z <br /> Plant Information and Erosion Control Plan R���O�ED <br /> arent and Amy Teele JUN � 2 2008 <br /> 577 Park Lane <br /> Orono, MN CITYOFORONO <br /> The slope will be cleared of vegetation the first day in order to properly grade and lay the steps. All <br /> plant material will be removed,except for the existing large shade trees. Care will be taken around the <br /> large trees so as not to damage the existing root system. After completion of the hardscape portion of <br /> the project approximately 267 new plants will be planted on the slope. These plants will be native to <br /> the area. . <br /> Before any work begins silt fence will be placed along the shoreline to prevent any debris from making <br /> its way into the lake.The silt fence will remain until the newly planted plants are established. During <br /> construction,sediment logs will be placed on areas that are not currently being worked on and they will <br /> be replaced/re-staked at the end of each working day at approximately halfway up the slope. <br /> Upon completion of the hardscape portion of the project an organic erosion control blanket will be <br /> placed on the entire slope and staked in place. The plants will then be placed through the erosion <br /> bfanket. All plants will have a hole cut into the blanket so the root systems are not damaged during <br /> planting. An organic hardwood mulch will be placed over the top of the erosion control blanket to a � <br /> depth of approx 2". <br /> The railing being placed on the step system will be placed on the down slope side,and will be custom <br /> buitt on site. If the grade at any point is greater than 30"from top of stairs to soil,a railing with vertical <br /> slats no greater than 4"will then be installed. <br /> Plant Information. <br /> Scientific Name Commnon name Qauntity Size <br /> Cornus racemosa Grey Dogwood 4 5 Gallon <br /> Symphoricarpos orbiculatus Red Snowberry 25 2 Gallon <br /> Solidago flexicaulis Zig-Zag Golden Rod 12 4" Pot <br /> Athyrium filix-femina Lady Fern 90 1 Gallon <br /> Andropogon gerardii Big-Blue Stem 53 1 Gallon <br /> Geranium maculatum Wild Geranium 83 4" Pot <br /> All plants are sourced from local vendors, and will be installed with all proper planting <br /> techniques. <br /> Plant descriptions are attached on separate sheets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.