My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00860 - demo
Orono
>
Property Files
>
Street Address
>
P
>
Park Lane
>
559 Park Lane - 06-117-23-41-0044
>
Permits/Inspections
>
2015-00860 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:50 PM
Creation date
6/13/2018 1:17:34 PM
Metadata
Fields
Template:
x Address Old
House Number
559
Street Name
Park
Street Type
Lane
Address
559 Park La
Document Type
Permits/Inspections
PIN
0611723410044
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
< . <br /> �QNO PRINCIPAL STRUCTURE DEMOLITION PERMIT <br /> ZONING DISCLOSURE & DECLARATION <br /> y � To the property owner: Demolition of the principal dwe�ling structure on a property may <br /> F �,� automaticaliy terminate certain rights which may have accrued to the property by virtue of the <br /> lqkfSHO� continued existence of that building. This means you may give up some or all of the zoning rights <br /> currently associated with the principal structure (setbacks, hardcover, size of building, etc) with its removal. <br /> • Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot area or width <br /> standards) may, with few exceptions, require variance approval by the Ciry Council, and such approval is neither <br /> automatic nor guaranteed but requires that a practical difficulty be demonstrated. <br /> • Additionally, all current zoning standards will have to be met by the new principal dwelling including setbacks, and <br /> building footprint, hardcover (impervious surface), & height limitations, etc. <br /> • Where municipal sewer is not available, provision of two (2) conforming on-site septic treatment sites is mandatory for <br /> a new dwelling. <br /> • Unless specifically approved by the City, all seasonal and permanent docks must be removed at the time of <br /> principal dwelling demolition. They may not be re-installed until a new principal dwelling has reached the framing <br /> stage. <br /> The following information is presented for the purposes of advising the property owner of the implications of removal of <br /> the rinci al dwellin on the ro e <br /> 1. Property Address: 559 Park Lane PID# 06-117-23-41-0044 <br /> 2. Zoning District: LR-1B Required Lot Area: 1 acre Required Lot Width: 140' <br /> Shoreland? Y N Actual Lot Area: .41 acre* Actual Lot Width: 100'* <br /> *according to Hennepin County <br /> Lot area varian is is not required. Lot width varianc is is not required. � <br /> 3. Required Setbacks: Front NA Rear NA Side 10' Side Street 35' <br /> Lakeshore Lot: Lake (Front) 75' Street (Rear) 30' <br /> Average Lakeshore Setbac • must be met 's not a licable. <br /> 4. Massing &Lot Coverage by Structures imited to 15%of lot area does not apply(lot area > 2 acres) <br /> 5. Hardcover limitations: Are NOT applicabl�—or - Are applicable. <br /> Stormwater Quality Overlay District Tier� 1 )2 3 Tier 1 hardcover limit = 25% of gross lot area <br /> U <br /> 6. Municipal sewer is available. <br /> 7. No wetlands(s) present. <br /> The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials <br /> � <br /> Property Owner's Signature Date <br /> (Original: Street File; Copy: Property Owner) <br /> Created: Apri12013 <br /> Last Updated: 1/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.