Laserfiche WebLink
Christine Mattson <br /> From: Joan ODonnell <odonnell.t.m@gmail.com> <br /> Sent: Tuesday, September 01, 2015 9:24 AM <br /> To: Christine Mattson <br /> Cc: Mark Way; Mark Gronberg; Melanie Curtis <br /> Subject: Re: 559 Park Lane/#2015-01001 <br /> Morning Christine <br /> Thanks so much for your email! <br /> Both houses on each side of the lot have decks on the upper level. Their bottom walkouts are concrete patios. I hope <br /> that helps with the line of sight question. <br /> We will work diligently to get these items back to you quickly. Thank you again for your help! <br /> Best Regards, <br /> Joan 0'Donnell <br /> 309.361.9302 <br /> On Sep 1, 2015, at 7:45 AM, Christine Mattson<CMattson@ci.orono.mn.us>wrote: <br /> Mark, <br /> The City Engineer has reviewed the survey dated 8-12-2015 and has the following comments: <br /> 1. The plan proposes 2 driveway connections to Park Lane. City Ordinance allows for one per <br /> property. The larger of the curb cuts is depicted at 29 ft wide. The maximum width for a <br /> driveway connection at the street is 20 ft. <br /> 2. Plan proposes work within the right of way to place a new culvert. The old culvert should be <br /> removed at the same time. Any work with in the Right of Way must be coordinated with Public <br /> Works via a Right of Way permit(copy attached). <br /> The planning and zoning department has the following comments: <br /> 1. The survey shows the average lakeshore setback measuring from a deck on the house to the <br /> south of 559 Park Lane. Is this an upper or lower level deck? If it's a lower deck,the average <br /> lakeshore setback line must be adjusted. Please clarify. <br /> 2. We have recently changed our survey requirements, copy attached. One of the new <br /> requirements is to show the point or spot where the top of the foundation etevation reference <br /> elevation point is being measured from;we expect this to be consistent with the measurement <br /> on the foundation as-built. Please show the measurement point on the survey. <br /> 3. An egress window is shown on the building plans, but not on the survey, please revise. <br /> 4. The survey must also show all proposed exterior/landscaping improvements, i.e. patios,grading, <br /> sidewalks, retaining walls,etc. We need the final landscape plan to be submitted and approved <br /> before we will issue the building permit. We also need the name of the landscape contractor <br /> performing the work. <br /> � <br />