My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P11141 - mechanical
Orono
>
Property Files
>
Street Address
>
P
>
Park Lane
>
543 Park Lane - 06-117-23-41-0043
>
Permits/Inspections
>
2007-P11141 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:49 PM
Creation date
6/13/2018 11:02:49 AM
Metadata
Fields
Template:
x Address Old
House Number
543
Street Name
Park
Street Type
Lane
Address
543 Park La
Document Type
Permits/Inspections
PIN
0611723410043
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PASSIVE MAKE-UP AIR OPENING SCHEDULE <br /> TABLE FOR SIZING PASSIVE MAKE-UP A.IR OPENINGS Diameter Path 0 Path 1 Path 2 <br /> lotes: a) This table assumes 20 feet of smooth unobstructed round ; 3 inches 50 cfm 35 cftn 15 cfm <br /> duct with three 90°elbows and a screened hood 4 inches 90 cfm 60 cfrn 30 cfin <br /> b) Equivalent designs calculated using pressures of 50 Pascals 5 inches 140 cfin 100 cfm 45 cfin <br /> for Path 0, 25 Pascals for Path 1, and 5 Pascals for Path 2 6 inches 200 cfm I40 cfm 65 cfm <br /> may be used. 7 inches 270 cfm 190 cfm 85 cfm <br /> c) If a make-up air opening is used with no duct or elbows,the 8 inches 350 cfm 250 cfm 110 cfrn <br /> - Diameter can be decreased by 1 inch. 9 inches 450 cfm 320 cfm 140 cfm <br /> d)' If flex duct is used,increase diameter b 1 inch. 10 inches 570 cfin 400 cfm 180 cfm <br /> Make-u Air A lication/Location CFM O enin size Duct T e <br /> ❑Smooth ❑Flex ❑O enin onl <br /> ❑ Smooth ❑Flex ❑O enin onl <br /> ❑Smooth ❑Flex ❑O enin onl <br /> ❑ Smooth ❑Flex ❑O enin onl <br /> AGGREGATE MAKE-UP AIR WORKSHEET <br /> INSTRUCTIONS _ <br /> itep 1. Complete Exhaust Schedule on the right indicating cfin of largest device in each category• �i�jAjJST' SC�-IEDITLE <br /> itep 2. Complete the Combustion Egarrpment Schedule on preceding page. DEVICE CFM <br /> 3tep 3. Choose a path with a Y(Yes)for all selected equipment. Clothes d er <br /> itep 4. Complete Aggregate Nlake-up Ai��table be(ow for chosen path.Using the total cfm from the Kitchen exhaust <br /> Exl�aust Schedule,indicate flow in cfm for proposed method(s)of providing make-up air. Other exhaust <br /> itep 5. Fill out the Passive Make-up Ai��Opening Schedz�le above. TOTAL <br /> � Path 0 —Aggl'egate IVlake-Up All' MethOd '.Passive' Passive Powered Mal:e-up <br /> Infiltration O enin <br /> °assive infiltration for up to 425 cfm ' <br /> ?assive openings for cfms over 425 <br /> °owered to match flow for cfins over 985 <br /> �1 P�th 1 —Aggregate Make-ll� AlI' �8f�'IOC� Passive Passive Powered Make-up' <br /> Infiltration O enin * <br /> Passive infiltration upto 175 cfm* . <br /> Passive openings for cfms over 175 <br /> Powered to match flow for cfms over 565 <br /> * If a closed controlled solid-fuel burning appliance is installed in Path 1,then a passive opening must be installed to provide make-up air for <br /> the c(othes dryer and for any central vacuum that e�chausts to the outside. ' <br /> ❑ lPatin 2 —Aggregate 1Vlake-U� �1�T[' �Ct1ilOC1 Passive Passive Powered' <br /> Infilfration O enin Make-u ' <br /> Passive openings for up to 175 cfm <br /> Powered to match flow for cfms over 175 N/A <br /> ❑ Path 3 —Aggt'egat� Make-up AIt' 1VIethOd Passive Passive Powered <br /> Infiltration O enin Make-u <br /> Powered to match flow N/A N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.