Laserfiche WebLink
Date: 6/18/2007 Revision Date: 6/18/2007 New Construction <br /> Site Information /} <br /> Address 1: �`�� ��`9�� L`'`'t Project#: 2001 <br /> Address 2: Lot: Block: <br /> City: Orono County: Hennepin Subdivision: <br /> Application Information <br /> Business Name: Dale Huber Company MN Contractor License#: <br /> Contact Person: Robin <br /> Office Ph: 952-894-4570 Fax: 952-894-4679 Cetl Ph: <br /> Address 1: 1200 West Highway 13 <br /> City: Burnsville State: MN Zip Code: 55337 <br /> House Details <br /> Square Feet: 3750 sq. ft. Avg. Ceiling Ht: 10 ft. Number of Bedrooms: 3 <br /> Ventilation : Balanced <br /> Total Ventilation Capacity : 164 cfm. <br /> Minimum Continuous Ventilation :60cfm. <br /> Intermittent Ventilation: 104 cfm. <br /> Combustion Appliance <br /> Water Heater: Direct Vent/Sealed Combustion Input BTUs: 50,000 Independently Vented <br /> Furnace/Boiler: Direct Vent/Sealed Combustion Input BTUs: 100,000 Independently Vented <br /> Other Combustion Appliances <br /> Gas Fired Direct Vent Fireplace(s): Yes Gas Fired Power Vent Fireplace(s): No <br /> Gas Fired Natural Draft Fireplace(s): No Solid Fuel Appliance(s): No <br /> Exhaust Equipment <br /> Continuous Exhaust Ventilation Capacity (cfm): NA Clothes Dryer (cfm): 135 <br /> Exhaust Fan Rating (cfm): 250 <br /> Make-Up Air <br /> No Make-Up Air Required by Code <br /> Combustion Air <br /> Minimum Combustion Air Requirements Have Been Met. <br /> , <br /> . — � i� -/5�� <br /> Applicant Name (print): `� � ( ��. c� h1���'1�' Signature/Date: �� �� G( <br /> Code Official (print): VI CL�1 Signature/Date: � ' � <br /> �2004 CenterPoint Energy Minnegasco. 2004 Mechanical Code Guidelines. Page 1 <br /> ,._ ,.,. � . <br />� '�, <br />