Laserfiche WebLink
oPnoruu <br /> LOIAf PROFILE <br /> HKH WIND 7EfaNINA17QN CAP <br /> TFR�MINAL710M SECURE FLASHING <br /> 4VITH NON-HARDENING <br /> SEALANTAND <br /> STORM ROOFlNG NAILS <br /> COLLAR � <br /> ROOF <br /> FLASF�IING <br /> Figure 18 <br /> wu�s Pipe Sections and the insulation or . <br /> nrr� � I other de�is. Far tt�e Attic Insulation <br /> �s�eE�onON ♦ �j Shieldr nail the base to floor of attic and <br /> �just shield for appropriate insulation <br /> level,then attac�the collar at the top <br /> m � of assembly(Fig. 79). For a chase <br /> endosure, it may be construded a�t of <br /> �u� sheetrock or similar building materials <br /> c� � � and framed around the supp�t box <br /> ' ' or the pipe, maintaining the dearance <br /> to combustibles as required by tt�e <br /> appliance manufacburer. F�vaulted <br /> ceilings a chase endosure must be <br /> constructed as the A#tic Insulatia� <br /> - ��� Shield can n�be installed. <br /> ��� <br /> �� CATHEDRAL CEILING <br /> ��� INSTALLATION <br /> __ Step 1. Fdlow installation Steps 1 <br /> and 2 ur�er Vertical Terminations. <br /> Figure 19 Step 2 Using the pfumb bob, maric <br /> 16 <br />