My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ivy Place - Project # 17-3962
Orono
>
Property Files
>
Street Address
>
I
>
Ivy Place
>
3508 Ivy Place - 20-117-23-42-0036
>
Land Use
>
Ivy Place - Project # 17-3962
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:59:45 PM
Creation date
6/13/2018 7:08:56 AM
Metadata
Fields
Template:
x Address Old
House Number
3508
Street Name
Ivy
Street Type
Place
Address
3508 Ivy Place
Document Type
Land Use
PIN
2011723420036
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. TIME OF PERFORMANCE. The Developer shall install all Improvements as <br /> contemplated by Section 8 and the approved Plans by December 31, 2019, with the exception of <br /> the final wear course of asphalt on private drive. <br /> 13. LICENSE. The Developer hereby grants the City, its agents, employees, officers <br /> and contractors a license to enter the Land to perform all work and inspections deemed appropriate <br /> by the City in conjunction with development of the Land. <br /> 14. EROSION CONTROL. Prior to initiating site grading, the storm water pollution <br /> prevention plan, and the erosion control plan shall be implemented by the Developer and inspected <br /> and approved by the City. The City may impose additional erosion control requirements if <br /> reasonably required. All areas disturbed by excavation and backfilling operations shall be reseeded <br /> within five (5) days after the completion of the work, weather permitting, or in an area that is <br /> inactive for more than ten(10) days unless authorized and approved by the City Engineer. Except <br /> as otherwise provided in the erosion control plan,seed shall be in accordance with the City's current <br /> seeding specification which may include certified oat seed to provide a temporary ground cover as <br /> rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary <br /> for seed retention. The parties recognize that time is of the essence in controlling erosion. If the <br /> Developer does not comply with the erosion control plan and schedule or supplementary <br /> instructions received from the City,the City may take such action as it deems appropriate to control <br /> erosion. The City will endeavor to notify the Developer in advance of any proposed action, but <br /> failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. <br /> If the Developer does not reimburse the City for any cost the City incurred for such work within ten <br /> (10)days,the City may draw down the"security"to pay any costs.No development,utility or street <br /> 5 <br /> Ivy Place Development Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.