Laserfiche WebLink
� � � � � ' � Page 4 of 4 <br /> Es�imat� I�, 2512� �_ . <br /> �� 81912016 <br /> 2 P)y Girder truss <br /> (regular truss 1&2 plied per instructions) <br /> i <br /> i <br /> 2x's in joiat hangen 24"o.c. <br /> match chord dimension <br /> i <br /> � <br /> ,� cloor � <br /> �r"��Y� �.� <br /> a <br /> �l��� f��) � � �� . <br /> ��� �� <br /> Plate '� � <br /> Wall Sheathing Y�� <br /> Studs @16 oc `� ��L Trusses are engineered <br /> (�; `� products and CAN NOT <br /> Illustration May Not Depict All Options Selectet��� ��'�� <br /> Hel ful Hints for Room In Attic Gara e Construction �e CUT, MODIFIED, or DRILLEC <br /> p 9 <br /> � Trusses can �ot be cut, modifed, or drilled into. <br /> � Increased loading for the floor is in the attic room area only. <br /> — �russes inciu�e� ,n tnis estimate �a not �ncluqe �vernanqs. <br /> Material to hand frame the overhang is included in the estimate. <br /> Framing details for proper installation of overhan s is available. <br /> Additional truss designs are also available, inclu ing trusses with eave <br /> overhangs, additional room sizes and more. See a buildin materials team <br /> member for more information about truss design and over ang framing details. <br /> � For Stair Construction: <br /> 1 . Stairs in this estimate are located on the end of the building. <br /> 2. Regular truss 1 is located next to regular truss 2 at approx. <br /> 48" from the building end allowing forthe stairopening. <br /> 3. Reg ular truss 1 and regular truss 2 must be plied together using 10d nails. <br /> Nilin rn fllw : 2rw r " nnrnh n mhr <br /> a g p a t t e a s o o s o s s t a g g e e d 9 o c e t e o t e t o p a d b o t t o c o d s, <br /> 1 row 9" on center on webs. <br /> 4. The roof area and floor area between the end truss and truss 1&2 are hand framed usir <br /> lumber that matches the truss top and bottom chords. <br /> � Chan ing the end trusses to regulartrusses may make it easierto install attic windows or <br /> to ad insulation to your garage in the future. Switching to end trusses will require <br /> additional plate and stud materials. <br /> Menards-provided matenal estimates are intentletl as a general construction aid and have been calculated using typical construction methods.Because of the wide variability in codes and site restrictions, <br /> all final plans and matenal lists must be venfed with your local zoning office. Menards is a supplier of construction materials and does not assume liability for design,engineering or the completeness <br /> of any material lists provided Untlerground electncal,phone and gas lines should be located and marked before your building plans are fnalized. Remember to use safety equipment including dust masks <br /> and sight and hearing protection dunng construction to ensure a positive building experience. <br />