My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010777 - new septic system
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Road North
>
030 Orono Orchard Road North - 35-118-23-33-0037
>
Septic
>
1998-010777 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:38 PM
Creation date
6/6/2018 1:04:50 PM
Metadata
Fields
Template:
x Address Old
House Number
30
Street Name
Orono Orchard
Street Type
Road
Street Direction
North
Address
30 Orono Orchard Road North
Document Type
Septic
PIN
3511823330037
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A ♦ <br /> MOUND SEPTIC SYSTEM DESIGN <br /> And SITE EVALUATION <br /> FOR <br /> Jim Murphy <br /> 30 Orono Orchard Road <br /> Orono,MN <br /> 473-2646 <br /> SITE <br /> 30 Orono Orchard Road <br /> Orono,NiN <br /> Hennepin County <br /> BY: <br /> DH Ezcavating <br /> MPCA License#644 <br /> P. O.Box 81 <br /> NYA,MN, 55397 <br /> 467-3098 <br /> NOTE: the site must remain protected before the construction of the mound in <br /> order to protect it from soil compaction c�used by vehicles driving over the sites. <br /> All property lines must be located before construction begins. All setbacks must be <br /> maintained. All installation must meet Local Unit of Government codes or MN <br /> Statute 7080; whichever is greater in its restrictions. <br /> This site is the best option for this lot. The area in the turn around is fill soil, <br /> and the other options are on slopes of greater than 12 percen� This site is not ideal <br /> but will perform adequatley in treating the waste water generated by the home. <br /> Because of the limited options the downslope was calculated at 12 percent even <br /> though the slope is actually 10 percent. This will add five feet of treatment area. <br /> Desisn requirements <br /> 450 gallons per day X.83 loading rate=380 square feet of rock bed <br /> 380/ 10 (width of rock bed)=381ineal feet of rock bed <br /> Material reauirements <br /> 2-1000 gallon tanks(use existing tanks if sealed and approved by the City inspector) <br /> 1-1000 gallon lift station with an audible/visual alarm in the home <br /> 20 tons of washed binder rock <br /> 244 tons of washed concrete sand <br /> 119 tons of black loam(28 of which needs to be sandy) <br />
The URL can be used to link to this page
Your browser does not support the video tag.