My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
O
>
Oxford Road
>
495 Oxford Road - 05-117-23-41-0011
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:21:26 PM
Creation date
5/30/2018 12:36:10 PM
Metadata
Fields
Template:
x Address Old
House Number
495
Street Name
Oxford
Street Type
Road
Address
495 Oxford Rd
Document Type
Septic
PIN
0511723410011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On the North Shore o f <br /> Lake Minnetonka <br /> ON-SITE SEWAGE TREATMENT <br /> INSPECTION REPORT � POST OFFICE BOX 66 <br /> 1335 S. Brown Rd. <br /> � � � Crystal Bay, MN 55323 <br /> 473-7357 <br /> OWNER �,�1 � ADDRESS . <br /> PERMITNO.'S. DATES l�I��O CONTRACTORS s�'�`����� <br /> City Ordinance No.210 requires that each on-site sewage treatment system in Orono be i�spected on a regular basis.The onsite sewage <br /> treatment system at the above address has been inspected and appears to fall into the category checked below. <br /> lThis is �an existing system ❑ new construction) <br /> � � Meeta or exceeds current City standards in ali respects relating to design,construction,and location.Appears to be operating <br /> properly. <br /> � 2 Does not meet all current City standards for new construction (1978 Code) but in most respects appears to be designed, <br /> located, a�d constructed generaily in accorda�ce with previous codes.System appears to be functioning properly;no major <br /> upgrading of the system is required at this time. <br /> � 3 Does not meet current City standards in many respects relating to desig�,construction,or location.Appears to be operating <br /> adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br /> this time. <br /> � 4 System may or may not meet current City standards for design,construction ot location, but is failing to properly treat and <br /> dispose of the current input,and is endangering a water supply,or is a source of pollution to surface or groundwaters,or is <br /> creating a safety hazard,or is otherwise creating a public nuisance.Ple�e contact the City Inspector to discuss system repair/ <br /> replacement procedures. If drainfield replacement is neceuary,soil testing will usually be required,and a design and site plan <br /> must be submitted for review.Your contractor must obtain a permit before work is started. <br /> SYSTEM CONDITION (m Checked items may require your action) <br /> Tank inapection indicates: ❑ Inspection pipe is located directly over tank baffle.(Does not <br /> �.Pumpout not needed at this time. give accurate measurement of solids accumulation.) If tanks <br /> ❑ Solids aecumulatio� in tenks indicates they shoutd be pump- have not been pumped out within the last three years,they <br /> ed out this year to help prevent future problems. should be pumped out now. <br /> ❑ Solids accumulation in tenks is at a critical level. Ta�ks Drainfield inspection indicetes: <br /> should be pumped out as saon as possible, ❑ Drainfield is dry,no surfacing evident. <br /> ❑ System is discharging to surface. Tanks must be pumped ,�-Some evidence of surfaci�g,not critical yet. <br /> withi�48 hours to eliminate surface discharge, ❑ Drainfield ia saturated and visibly discharging untreated <br /> ❑ tnspection risers miuing—tanks could not be inspected, effluent to the surface, This condition may require replace- <br /> Inspection risers (4"dia. pipe)must be installed in esch tank ment or additions to drainfield. Contact the City Inspector <br /> at next pumpout. If tanks have not been pumped out within immediately.Repairs must be completed within 90 days. <br /> the last three years,they should be pumped out now. ❑ Drainfield extent and condition unknown. <br /> SITE CHARACTERISTICS: <br /> Limiting Site Factors Potential for System Failure Site Capabilities for <br /> ❑ Slope (depends on soil types,water Future Expansion <br /> ❑ Soil table,and system co�dition) Adequate <br /> O High water table ❑ Low Fair <br /> O Lot size ❑ Medium ❑Poor <br /> ❑ Lake,wetland,or stream �High � Inadequate <br /> ❑ Drainage System is causing visible <br /> surface discharge. <br /> COMMENTS: <br /> ��� <br /> Date of Inspection ptic System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be advised that <br /> this report dces not guarantee or certify that an existing system will continue to functio�properly,but is merely an opi�ion of the adequacy <br /> of the system under current conditions besed o�the available information, <br /> This report must be kept on the premise;with system location and pumping records. <br /> WHITE COPY/Inspector's File GOLD COPY/Homeowner <br />
The URL can be used to link to this page
Your browser does not support the video tag.