My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MCWD permit
Orono
>
Property Files
>
Street Address
>
O
>
Oxford Road
>
475 Oxford Road - 05-117-23-41-0010
>
Permits/Inspections
>
MCWD permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:21:21 PM
Creation date
5/30/2018 11:18:37 AM
Metadata
Fields
Template:
x Address Old
House Number
475
Street Name
Oxford
Street Type
Road
Address
475 Oxford Rd
Document Type
Permits/Inspections
PIN
0511723410010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i . . <br /> Erosion Control Supptemental Information <br /> Final Stabilization will be provided with(seed,sod, etc): ��3� oR- 5�-� <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> ❑Not Applicable ❑Off site ❑ Indicated on site plans ❑Other(description): <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater, of all vegetarion to Ue retained. <br /> �Yes �Not Applicable �Other(description): <br /> Inspections:An erosion control inspection plan is required for a11 projects disturbing 1/4 acre or <br /> greater.The inspection requirements are as follows: <br /> 1) The individual identified as being responsible for implementing the erosion control <br /> plan musi routinely inspect the construction srte once every seven days during active <br /> construction and it�ithin 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hours. <br /> 2) r111 inspections and maintenance conducted during construction must be recorded in <br /> writing and these records must be retained�vith the erosion control plan and made <br /> available at the District's request within 24 hours.Records of each inspection and <br /> maintenance activity shall include: <br /> i. Date and time of inspections; <br /> ii. Name of person conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and parry completing <br /> maintenance activities);and <br /> v. Date and amount of all rainfall events greater than 0.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> �T"�Yi� �Gt�f <br /> Name T�GLR-dlQ S �?GC'��I�i(n P���?�� <br /> Organization (� C� •r <br /> Phone l/.+�Z-68 5�- ��� 3 Alternate Phone <br /> Email <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> .J'�v-'/.� <br /> Signature of licant or Authorized Agent Date <br /> 5�?S c�c���� �, <br /> Project Address <br />
The URL can be used to link to this page
Your browser does not support the video tag.