My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01489 - sewer disconnect
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
570 Orono Orchard Road South - 02-117-23-31-0057
>
Permits/Inspections
>
2016-01489 - sewer disconnect
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:08:57 PM
Creation date
5/23/2018 2:53:52 PM
Metadata
Fields
Template:
x Address Old
House Number
570
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
570 Orono Orchard Rd S
Document Type
Permits/Inspections
PIN
0211723310057
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> a'DETERMtIsINO PERMIT.FEES <br /> 0 SAC Charge(2015 Rate=$2,485.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> 1=111.. •wer Connection Disconn /Repair($50.00/Per Stub) $ <br /> Pipe size L( inches;material Schd 40 air tested; cast iron <br /> ❑Water Connection/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> ❑Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availability Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ 1.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ <br /> ADDITIONAL INFORMATION—WATER METERS <br /> • WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> • WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of meter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit,agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made . • this application are,true and correct. <br /> t• Date: (/ (6 <br /> Applicant: _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.