My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00969 - new structure
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
570 Orono Orchard Road South - 02-117-23-31-0057
>
Permits/Inspections
>
2016-00969 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:08:56 PM
Creation date
5/23/2018 2:44:36 PM
Metadata
Fields
Template:
x Address Old
House Number
570
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
570 Orono Orchard Rd S
Document Type
Permits/Inspections
PIN
0211723310057
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fees to be Charged YES NO <br /> Permit <br /> Flan Review L �^ <br /> Stat Surchatre <br /> Investigation Fee <br /> SAC-Number of SAC tin V <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> V Floor X = $ <br /> 2^d Floor X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ 5:0 9,I.7f 1t ✓ <br /> Orono inspections Required Work Requiring Separate Permits <br /> - Footing tS Site Plumbing O Grading/Filling <br /> Poured Wall ,Silt Fence/Erosion Control Mechanical 0 Fire <br /> oundation Survey 0 Hardcover Removal Ft Fireplace 0 Water Connection <br /> © Framing 0 Other(specify) 0 Masonry 2iIC Sewer Connection <br /> Waterproofing/Drain tile )<Mfg. 0 Lawn Irrigation <br /> : Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> tlir Framing <br /> Insulation <br /> As-Built Survey <br /> -; Final <br /> --. Lathe Required State Permits <br /> O Other(specify) <br /> )(Well Electrical <br /> REWIARKS (in-house): <br /> OFFICIAL REMARKS-TO BE NOTED ON PERMIT AND INITIALLED: <br /> O See Builder Acknowledgement Form <br /> O Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated. October 2016 <br /> vlforrns\plan review checklist 10-2016.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.