Laserfiche WebLink
GOLIRTH <br /> Installer's Nam( Craig E/Mark <br /> Installation Checklist Franchise Location: Minnesota • <br /> Installation Date: 8/22/17 Installation Equipment: GoliatheTech Calibrated Hydraulic Drill with PSI Guage Torque Indicator <br /> Description of customer project: Deck Name of Customer or Contractor: KRJ <br /> Address of project: 570 Orono Orchard Rd <br /> Reqired Cut-off Inclination of Achieved Tension Achieved <br /> Compression Required Total Pile Length Elevation(if Pile(if not 90 Compression <br /> Pile Number Ca acit Torque Pile Used Helix UsedCapacity <br /> p y q (if not 7) not 8"+-2) Degrees+2) Torque Achieved Capacity <br /> Pile 1: 4500 500 1 7/8" 8" 750 3375 5175 <br /> Pile 2: 100 500 1 7/8" 8" 1250 4500 6750 <br /> Pile 3: <br /> Pile 4: <br /> Pile 5: <br /> Pile 6: <br /> Pile 7: <br /> Pile 8: <br /> Pile 9: <br /> Pile 10: <br /> Pile 11: <br /> Pile 12: <br /> Pile 13: h <br /> Pile 14: <br /> Draw your project here: <br /> 1111 House <br /> 1111 <br /> 41111 <br /> The presence o/this document m SharePoint certifies that the matenal contained within has been approved for release and supersedes allprewous versions <br /> Documcnt Namc Instnllalion ChccAlisl Internal Document Not for General Dismbuoon Copyn3ht©2013 GohathTech Incorporated All Rights Reserved. Date Updnlcd:April 13th 21115 Page 1 of 2 <br /> Pile 15: <br /> Pile 16: <br /> Pile 17: <br /> Pile 18: <br /> Pile 19: <br /> Pile 20: <br /> Pile 21: <br /> Pile 22: <br /> 1 <br />