My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10538 - demo
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
485 Orono Orchard Road South - 02-117-23-32-0001
>
Permits/Inspections
>
2006-P10538 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:09:04 PM
Creation date
5/23/2018 10:33:10 AM
Metadata
Fields
Template:
x Address Old
House Number
485
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
485 Orono Orchard Rd S
Document Type
Permits/Inspections
PIN
0211723320001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Within 5 working days of superstructure removal,a final inspection shall be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation (except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 9. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,including attorney fees,against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> 10. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must <br /> be pumped,crushed and filled with native soils. An inspection is required after the tanks are <br /> pumped and before the tanks are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> $50.00 -Principal Structure <br /> K $30.00 - Accessory Structure <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE(add lines 1-2 above) $ <br /> The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit,agrees to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all state de on t ' pplica ' n are complete,true and correct. <br /> APPLICANT'S SIGNATURE: Date: 117)64_0. <br /> OWNER'S SIGNATURE: Date: <br /> APPROVED BY: Date: //—I�(-0,�, <br /> Bui ding Official) <br /> *ZONING DISCLOSURE REQUIRED? o YES O <br /> * This Must Be Filled Out By Zoning Department - For Either Ansi er, A Zoning Official Must Sign All <br /> Applications <br /> /' <br /> Date: G `) // q <br /> *APPROVED BY: <br /> (Zoning Official) <br /> Reset Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.