My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P03161 - new septic system
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Road South
>
450 Orono Orchard Road South - 02-117-23-31-0047
>
Septic
>
2000-P03161 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:08:29 PM
Creation date
5/22/2018 1:43:50 PM
Metadata
Fields
Template:
x Address Old
House Number
450
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
450 Orono Orchard Rd S
Document Type
Septic
PIN
0211723310047
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iov5�1 ia�" ..� <br /> • • <br /> PUMP SELECTION PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm Perforation Discharges sn GPM <br /> Head Perforation diameter <br /> Pressure Distibution (feet) (inches) <br /> 3.a. Select number of perforated laterals 3 7/32 1/4 <br /> b. Select perforation spacing= 3.0 feet. 1.0a 0.56' 0.74 <br /> c. Subtract 2 ft.from the rock layer length. 1.5 0.69 0.90 <br /> "° -2 ft.= feet. 2.0b 0.80 1.04 <br /> Rock layer length <br /> d. Determine the number of spaces between perforations. a Use 1.0 foot single homes. <br /> Length perf.spacing=2.s ft.+,,12.ft._ spaces b Use 2.0 feet for anything else. <br /> e. 3 spaces+1=,3 3 perforations/lateral <br /> f. Multiply perforations per lateral by number of laterals to <br /> 1)y`l-p, A--- <br /> ,,v,s-c %-t\ YVI rJ 6S '--\-S, <br /> :let total number of perforations.nal. x -ArhunT= perforations. i ),i -4 4;Y "Al via ;. <br /> g. x IAN=2�gpm. <br /> SELECTED PUMP CAPACITY . ') 3 gpm <br /> B.Determine head requirements: <br /> 1. Elevation difference between pump and point of discharge. <br /> u_feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure Sod treatment system <br /> required at manifold if gravity system,zero. ?c„. <br /> ------feet It">i�With <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Elevation Memo <br /> o,Me <br /> Read friction loss in feet per 100 feet from table(F-14). PSP' M K .. <br /> i? <br /> i <br /> F.L. _ft./100 ft of pipe r <br /> o <br /> b. Determine total pipe length from pump to discharge <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe length-1.25 times pipe length= • <br /> a s`D x 1.25= 31 feet Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying Nominal <br /> friction loss in ft/100 ft by equivalent pipe length. pipe dia. <br /> Total friction loss- • 0 x 3 11- +100= • feet How Rate <br /> 4. Total head required is the sum of elevation difference, 1.5" 2" 3" <br /> special head requirements,and total friction loss. <br /> 20 2.47 0.73 0.11 <br /> Z to + s" + Q- 25 3.73 1.11 0.16 <br /> ' (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> TOTAL HEAD S(c feet `5 8.91 2.64 0.39 <br /> 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection 60 5.60 0.82 <br /> 65 6.48 0.95 <br /> • <br /> 70 7.44 1.09 <br /> 1. A pump must be selected to deliver at least <br /> C)3 gpm (Step A)with at least 5`(.., feet of total head(Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.