My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04341 - demo
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
450 Orono Orchard Road South - 02-117-23-31-0047
>
Permits/Inspections
>
2001-P04341 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:08:30 PM
Creation date
5/22/2018 1:42:08 PM
Metadata
Fields
Template:
x Address Old
House Number
450
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
450 Orono Orchard Rd S
Document Type
Permits/Inspections
PIN
0211723310047
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 7. Within 5 working days of superstructure removal,a final inspection shall be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation(except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> $. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents,employees and assigns from and against all claims,damages, losses ox <br /> expenses,including attorney fees,against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees,agents, subcontractors or assigns. <br /> 9. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks trust <br /> be pumped,crushed and filled with native soils. An inspection is required after the tanks are , <br /> pumped and before the tanks are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> $50.00-Principal Structure <br /> $30.00-Accessory Structure <br /> I_ Subtotal of above permit requested S 50, 0 'D <br /> 2. State Surcharge S .S0 <br /> • <br /> 3. TOTAL PERMIT FEE(add lines 1-2 above) $ 5 0 , S' <br /> The undersigned hereby applies to the City of Orono for issuance of aDemolition Permit,agrees to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are complete,true and correct. <br /> APPLICANT'S SIGNATURE: 'I Date; - .3 _ <br /> OWNER'S SIGNATURE: ✓� s -J2. Dare: 7- l 3 <br /> APPROVED BY: - .1)%.6c _Date: q - 3-0I <br /> tae_{ �i i7.�q a - 7tI-i. , 915►�IZ2 pi ONOSO JO AlUD-mo:� UtlitlO l002-02-5lW <br /> s d 66z�L�69Z' - ii: i I z t 8 . 't `6 wired.) 'aHi'XHvaNioa Woaa <br />
The URL can be used to link to this page
Your browser does not support the video tag.