My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including 1994 design
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Road South
>
385 Orono Orchard Road South - 02-117-23-23-0009
>
Septic
>
septic info including 1994 design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:27 PM
Creation date
5/22/2018 12:03:01 PM
Metadata
Fields
Template:
x Address Old
House Number
385
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
385 Orono Orchard Rd S
Document Type
Septic
PIN
0211723230009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
occ <br /> CITY OF ORONO <br /> SEPTIC SYSTEM APPROVAL <br /> CITY of ORONO <br /> A ' r�•r, ;k�7 Municipal Offices <br /> s I f r r of; Post Office Box 66 <br /> kyrG Crystal Bay,Minnesota 5532."-0066 <br /> ae?'fr <br /> LOCATION: 385 Orono Orchard Rd. S. <br /> OWNER: //ou/a di <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: S—P Testing REPORT DATE: January 5, 1994 <br /> The City of Orono has Approved your on-site system design as of January 12, 1994 <br /> (approved-disapproved) (date) <br /> with the following comments:When the eastern drainfield site is used, an interceptor <br /> drain must be installed to remove upslope drainage. Based on the soil <br /> testing information, a four bedroom home is the maximum allowable on <br /> this lot. <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF ORONO <br /> By 444 I <br /> Stephen ckman, On-site Systems Manager <br /> TELEPHONE-473-7357• FAX-473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.