My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
320 Orono Orchard Road South - 02-117-23-24-0002/4
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:37 PM
Creation date
5/22/2018 11:11:29 AM
Metadata
Fields
Template:
x Address Old
House Number
320
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
320 Orono Orchard Rd S
Document Type
Septic
PIN
0211723240004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°2111 <br /> ,,k ,,t ,ii,,,_ CITY of ORONO <br /> ,\ pa ., ...... <br /> �, /,' j ,��'II Municipal Offices <br /> \fi r 6 Street Address: qSa-a49-46o O Mailing Address: <br /> HQ¢ 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To Current Owner: Address: 3 a6 Dr0 No 6 r curd J-5 <br /> City Ordinance 199 requires that each existing on-site sewage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the categories checked below. <br /> SYSTEM CONFORMITY (1-3): <br /> 1 "CODE SYSTEM"An ISTS which meets all the location,design and construction standards of the current Orono Municipal Code. <br /> 2 "COMPLIANT SYSTEM" An ISTS which does not meet all the location,design and construction standards of the current Orono <br /> Municipal Code but does meet the three foot separation requirement or two foot requirement for systems installed 1996 or earlier,and <br /> which is not failing or an imminent threat to public health or safety. <br /> OD"NON-COMPLIANT SYSTEM" A prohibited ISTS;an ISTS located within a designated 100-year flood plain,any ISTS which may <br /> or may not meet all the location,design,or construction standards of the current Orono Municipal Code and which is failing for any <br /> reason;and any ISTS with less than three feet of unsaturated soil or sand between the distribution device and the limiting soil characteristics. <br /> r <br /> TANK CONDITION(5-7): 6 <br /> Tank inspection indicates: <br /> Pumpout not needed at this time. <br /> Septic6 tanks must be pumped out thi year (city code recommends tanks to be pumped out once every 3 years. <br /> 6 <br /> Tank was last pumped LA-14-0(1 ). <br /> Make sure septic tanks are pumped through manhole and not through white inspection pipes. This allows for the proper <br /> cleaning. Keep water softner and iron filter discharge out of septic system to_prolong life of drainfield. Ask pumper to test <br /> alarm float to verify alarm is still working in your house. The alarm warns owner that septage is about to backup into basement. <br /> 7 Inspection risers missing-tanks could not be inspected. Inspection risers(4"dia.pipe)must be installed in each tank. If <br /> tanks have not been pumped out within the last three years,they should be pumped out now. <br /> DkINF <br /> IELD CONDITION(8-10): <br /> Drainfield is dry,no surfacing evident. <br /> Some evidence of surfacing,not critical yet. <br /> 10 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector <br /> immediately.Repairs must be completed within 90 days. <br /> COMMENTS- O s".r C-,-t\U -.S cm) (off a,.� 4.— r.vS1- ;C <br /> Ce At \Z--11--2,6\v _, f(oft <br /> - 514< •l0 <br /> .SA) 4---.--kr 0s- _ <br /> os,--1,1--b‘\ 6-\.\-,0.< Als/c ..... <br /> Date of Inspection Matt Bohemian- Septic System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be advised that this report does <br /> not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of the adequacy of the system under current <br /> conditions based on the available information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.