Laserfiche WebLink
DETERMINING PERMIT FEES <br /> ❑SAC Charge(2007 Rate=$1,825.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> Sewer Connection Disconnect Repair($35.00/Per Stub) $ 3s CO <br /> Pipe size inc :., , al Schd 40 air tested; cast iron <br /> ®Water Connection/Disconnect/Repair($35.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> 1. SUBTOTAL of Permit Requested: $ 3 Jr 6 0 <br /> 2. STATE SURCHARGE $ <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ 3 7. 0 0 <br /> ADDITIONAL INFORMATION—WATER METERS <br /> • WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> • WATER METERS must be set and sealed by Orono Water Department(952) 249-4600, upon <br /> completion of meter installation. <br /> The undersigned hereby : •t es • the Ci of Oro 1: for issuance of a Utility Permit,agrees to do <br /> all work in strict . . • . . - ' ith the •r - of the City and the regulations of the State of <br /> Minnesota,and - - i . all sta - .de on this application are,true . d correct. <br /> Applicantle <br /> a/ �� . J OF <br /> -�� le Date: <br /> Reset Form <br />