Laserfiche WebLink
DETERMINING PERMIT FEES <br /> 0 SAC Charge(2015 Rate=$2,485.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not pre ai a sewer connection permit will not be issued) <br /> []'Sewer 'onnectio l j rte.%-'epair($50.00/Per Stub) $ 50.0 0 <br /> Pipe s.: inches;m. ena Schd 40 air tested; cast iron <br /> ❑Water Connection/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availability Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> 1. SUBTOTAL of Permit Requested: $ 6 0 . 00 <br /> 2. STATE SURCHARGE $ 1.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ C / .0 <br /> 2.002. <br /> `J <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ ` , 0' 0 <br /> ADDITIONAL INFORMATION-WATER METERS <br /> • WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> • WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of meter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict a ordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and c rti,es th t all statements ade on this application are,true and correct. <br /> P y(.AI c— -- Date: <br /> Applicant: r <br />