My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: buildability of property
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Road South
>
190 Orono Orchard Road South - 02-117-23-21-0009
>
Correspondence
>
Re: buildability of property
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:01 PM
Creation date
5/18/2018 2:15:09 PM
Metadata
Fields
Template:
x Address Old
House Number
190
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
190 Orono Orchard Rd S
Document Type
Correspondence
PIN
0211723210009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t I <br /> Mike Gaffron <br /> From: Mike Gaffron <br /> Sent: Friday, November 05, 2010 9:19 AM <br /> To: 'Thomas Crosby' <br /> Cc: 'William McGuire' <br /> Subject: RE: 190 Orono Orchard Rd <br /> Attachments: Orono Code Sections 78-71 and 78-72.pdf <br /> Tom - <br /> Staff has reviewed your proposal regarding the building located at 190 Orono Orchard Road, which is <br /> vacant and in need of repairs. Your proposal contemplates removal of the superstructure but retention of <br /> the foundation of the existing building, in an attempt to secure the rights granted to a legal <br /> nonconforming structure, for 15 years instead of 1 year. <br /> We have to start with the premise that the existing building is considered to be a lawful nonconforming <br /> structure due to its location almost completely within the required front and side street yards of the <br /> property. The applicable City ordinances are found in Zoning Code Sections 78-71(a) and 78-71(c). <br /> Section 78-71(a) relates to nonconformities generally. It allows the existing structure to remain in place <br /> and be repaired when declared unsafe by the building official, but does not allow it to be enlarged, <br /> expanded, extended, or altered in any manner which increases its nonconformity. <br /> Section 78-71(c) pertains specifically to nonconforming structures. 78-71(c)(1) pertains to involuntary <br /> damage or destruction and does not apply to this situation because any removal of the existing building <br /> is at the option of the property owner. <br /> Section 78-71(c)(2) is directly applicable to the voluntary and intentional removal of all or portions of a <br /> lawful nonconforming structure and allows it to be restored only if a permit is applied for within 180 <br /> days of commencement of the removal. If no permit is applied for within that time period, all future <br /> construction would be required to be in compliance with the Code, unless a variance is obtained. If a <br /> permit is applied for within the 180-day period, commencement of construction through final <br /> completion must meet the timing requirements specified in the pertinent Building Codes, i.e. permit <br /> must be obtained within 180 days of application, exterior construction must be completed within 12 <br /> months after permit is issued, interior work must be completed within 24 months of permit issuance. <br /> Removal of the superstructure of the building would constitute voluntary and intentional removal. Re- <br /> use of the foundation, or removal and replacement in-kind and in the same location of that foundation <br /> and replacement of superstructure, would be subject to the provisions of 78-71(c)(2) including the <br /> above-noted timeframes. A 15-year `grace period' for re-use of the existing foundation (or complete <br /> reconstruction in the existing nonconforming footprint) is in conflict with the City Code. <br /> If you were to remove the structure and then after a number of years choose to rebuild on the property, <br /> lot area and width variances would be necessary. Because the defined lot area is approximately 1/2 acre <br /> when the wetlands are excluded, the property would not qualify for the `administrative variance' <br /> allowed in 78-72(b)(2). From a staff perspective the likelihood of being granted the necessary lot area <br /> and width variances is extremely high, but variances for setbacks to build outside the legal building <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.