My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: sewer project
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
110 Orono Orchard Road South - 02-117-23-21-0022
>
Correspondence
>
Re: sewer project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:13 PM
Creation date
5/18/2018 12:41:43 PM
Metadata
Fields
Template:
x Address Old
House Number
110
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
110 Orono Orchard Rd S
Document Type
Correspondence
PIN
0211723210022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.0,04. <br /> O O , <br /> :1.,-_, . - CITY of ORONO <br /> v�' 1, iv' _r� '�15r / Municipal Offices <br /> '�j .!,1 , -,,s,!;,%--;&,G Street Address: Mailing Address: <br /> ' 'Egg04' 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> February 18, 2000 <br /> James & Maude Wyffles <br /> 110 Orono Orchard Road South <br /> Wayzata, Mn 55391 <br /> Dear Mr. &Mrs.Wyffles: <br /> The above described property is in a Metropolitan Urban Service Area(MUSA) for sanitary sewer <br /> installation. The factors for initiating the sewer project were smaller lot sizes and non-compliant septic <br /> systems with limited replacement sites available. The residence was required to connect to the sewer <br /> system no later than February 14, 2000. Recently, the City Council adopted a resolution allowing all <br /> sewer connections to coincide with the septic system upgrade time frame. The time frame for a septic <br /> system upgrade is seven to ten years from the inspection date dependant upon the property's location. <br /> Your property will need to connect to the sanitary sewer system no later than December 31, 2008,which <br /> is the date your septic system was to be upgraded. A Sewer Availability Charge (SAC) fee will need to <br /> be paid to the City in the year the sewer connection is made. A licensed plumber must then obtain a <br /> permit from the City to make the connection from the residence to the actual sewer line. <br /> If at any time before December 31, 2008 the residence undergo's a remodeling project that will increase <br /> the total water use, the residence must then connect to the sanitary sewer system. If at any time before <br /> • the above date the system is failing,the residence must then immediately connect to the sanitary sewer <br /> system. <br /> Minor maintenance can and should still be conducted on your septic system. Pumping the septic tanks, <br /> repairing or replacing pumps, and replacement of septic tank baffles are examples of acceptable repairs. <br /> If the septic system needs major maintenance, such as septic tank replacement or drainfield replacement, <br /> connection to the sanitary sewer system will be required. <br /> If there are any questions regarding this letter,please contact me at(612) 249-4600. <br /> Rete. lly, <br /> 1 <br /> id <br /> ris Pence <br /> On-Site Systems Manager <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.