My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02810 - Septic
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Rd S
>
015 Orono Orchard Road South - 02-117-23-22-0002
>
Septic
>
2000-P02810 - Septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:10:35 PM
Creation date
5/17/2018 1:25:27 PM
Metadata
Fields
Template:
x Address Old
Address
015 Orono Orchard Rd S
Document Type
Septic
PIN
0211723220002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> JOB SITE ADDRESS: eon>D n2 fi►`ote d P`,m d <br /> Occupancy Type: Residential X Commercial Other <br /> Permit Type: New or Replacement System, $100.00 <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: Li. el e h u-../ . Phone Number: 4/70 -7 V/ s <br /> Mailing Address: /..A4Qicet, 4v City: k Eio.1940e.J .5'l <br /> Contractor's Name: cam.Cd/o..d 4c Phone Number: c1 V Z-.TS'�s``S <br /> Mailing Address: S'20 4Rec, -so ! City: O tre$ ii , 7 <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspectbr. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior tocovering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.