Laserfiche WebLink
SWPPP <br /> 2340 Oliver Hill Road, Orono MN, 55356 <br /> --Submitted as part of building permit for same address. <br /> —Soil type is clayish. <br /> —Minnehaha Creek Watershed District has identified Tanager Lake,more than one mile away,as the <br /> body of water receiving runoff. <br /> —Silt fence to be constructed on side property lines and at wetland buffer line at rear of construction <br /> area.Silt logs or silt fence to be maintained at curb.Rock construction entrance to be installed and <br /> maintained throughout construction.All trades required to scrape streets daily by contract. <br /> —Excavation and backfill to be completed in a timely manner(within 14 days of each other weather <br /> allowing). <br /> —Site inspections to take place and be logged every seven days or within 24 hours of any rain event of <br /> 0.5"or more.Inspecting parties to be Stacy Erstad,Paul Hollerbach,Sandra Hollerbach,or Robert <br /> Erstad,U of Mn Certified SWPPP installer.Verification here: <br /> Entire construction site and immediately surrounding areas to be looked at during each inspection. <br /> —Pautz Construction(allabouterosion.com)of Prior Lake,MN to be retained for other necessary SWPPP <br /> BMP's and/or cleanup. <br /> —Final stabilization to be achieved by installation of sod and mulched,planted landscape beds. <br /> Completion date to be no later than 11/30/2018. <br /> Robert Erstad <br /> 952-446-5599 <br />