My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including alternate septic site plan
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Road North
>
105 Orono Orchard Road North - 35-118-23-33-0003
>
Septic
>
septic info including alternate septic site plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:24 PM
Creation date
5/10/2018 12:11:26 PM
Metadata
Fields
Template:
x Address Old
House Number
105
Street Name
Orono Orchard
Street Type
Road
Street Direction
North
Address
105 Orono Orchard Road North
Document Type
Septic
PIN
3511823330003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. ABSO- • ION WIDTH <br /> 1. Abso •ti•n width -•uals absorption ratio(see Figure D-33)times rock layer width <br /> x 10.0 ft = 15.0 ft <br /> G. MOUND -LOPE WIDTH&LENGTH(Greater than 1%) <br /> 1. Downslope absorption width=absorption width minus rock layer width <br /> 1k5 feet - 10 feet= 5 feet <br /> 2. Calculate mound size <br /> UPSLOPE <br /> a.Determine depth of clean sand at upslope edge of rock layer=3 feet minus distance to restricting layer(C1) <br /> 3i ft - 1.5 ft= 1.5 feet <br /> I <br /> b.Mound height at the upslope edge of rock layer=depth of clean sand for separation(G2a) <br /> at upslopEr edge plus depth of rock layer(1 foot)to depth of cover(1 foot) <br /> 1.5 ft+1ft+1 ft= 3.5 feet <br /> c.Upslope berm multiplier based on land slo.- see figure D-34) <br /> Select berr#i multiplier of 3.03 <br /> d.Upslope width=berm multiplier(G2c)times upslope mound height(G2b): <br /> 3.03 x 3.5 ft = 10.6 feet <br /> 13-34 LOPE MULTIPLIER TABLE <br /> Land f UPSLOPE DOWNSLOPE <br /> Sloppr, multiplirrsforvarious mulfiplieisforvuious <br /> Li <br /> 90 slope ratios slope ratios <br /> 3 1 4:1 5:1 6:1 7:1 8:1 3:1 4:1 5:1 6:1 7:1 <br /> 0 3 4.0 5.0 6.0 7.0 8.0 3.0 4.0 5.0 6.0 7.0 <br /> 1 2 1 3.85 4.76 5.66 6.54 7.41 3.09 4.17 5.26 6.38 7.53 <br /> 2 2 3 3.70 4.54 5.36 6.14 6.90 3.19 4.33 5.56 6.82 8.14 <br /> 3 2. 3.57 435 5.06 5.79 6.45 330 4.54 5.88 732 8.86 <br /> 4 2. 8 3.45 4.17 4.84 5.46 6.06 3.41 4.76 6.25 7.89 9.72 <br /> 5 241 333 4.00 4.62 5.19 5.71 3.53 5.00 6.67 857 10.77 <br /> 6 2.54 3.23 3.85 4.41 4.93 5.41 3.66 5.26 7.14 9.38 12.07 <br /> 7 2.48 3.12 3.70 4.23 4.70 5.13 3.80 5.56 7.69 1034 13.73 <br /> 8 2.42 3.03 3.57 4.05 4.49 4.86 3.95 5.88 8.33 11.54 15.91 <br /> 9 2 2.94 3.45 3.90 4.30 4.65 4.11 6.25 9.09 13.04 18.92 <br /> 10 23 2.86 333 3.75 4.12 4.44 429 6.67 10.00 15.00 2333 <br /> 11 2.2 2.78 3.23 3.61 3.95 4.26 4.48 7.14 11.11 17.65 30.43 <br /> 12 2.2 2.70 3.12 3.49 3.80 4.08 4.69 7.69 12.50 21.43 43.75 <br /> DOWNSLOP <br /> e.Drop in ele ation=rock layer width(D2)times percent landslope(C5)/100 <br /> 10 ft x 8 % /100: 0.8 feet <br /> f.Downslope round height=depth of dean sand for slope difference(G2e) <br /> at downslope rpck edge plus the mound height at the upslope edge of rock layer(2b) <br /> 0.80 ft + 3.5 ft= 4.3 feet <br /> g.Downslope rm multiplier based on percent land slope(see Figure D-34) 3.95 <br /> h.Downslope idth=downslope multiplier(G2g)times downslope mound height(G2f) <br /> 3.95 x 4.3 = 17.0 feet <br /> i.Select greater of G1 and G2h as the downslope width 17.0 feet <br /> j.Total mound uiidth is the sum of upslope(G2d)width plus rock layer width(D2)plus downslope width(G2i) <br /> 10.6 ft+ 10.0 ft+ 17.0 ft= 37.5 feet <br /> k.Total mound I ngth is the sum of upslope width(G2d)plus rock layer length(D3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.