Laserfiche WebLink
u <br /> , , a <br /> .,Q, Q „„,.,,„,c-All h ITY OF ORONO <br /> y- �a” SE ' C SYSTEM APPROVAL <br /> •�; tiiftY of ORONO <br /> VCr:' <br /> Municipal Of ces <br /> \N �� Post Office Box 66 <br /> Crystal Bay,Minnesota 55323-0066 <br /> kES- <br /> LOCATION: 40 Orono Orchard Rd. N. <br /> OWNER: David Struyk <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: Koch' s Soil Testing REPORT DATE: August 20, 1994 <br /> The City of Orono has Approved your on-site system design as of August 2 3, 1994 <br /> (approved-disapproved) (date) <br /> with the following comments: The lot lines must be verified prior to system <br /> i <br /> installation. C:./� rktifr-e06 IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF ORON• <br /> By G' 7.00. • <br /> Stephen -c an, On-site Systems Manager <br /> TELEPHONE—473-7357•FAX-473-0510 <br />