Laserfiche WebLink
TO: Fil ; 40 Orono Orchard Road North <br /> FROM: Stephen Weckman, On-Site Systems Manager <br /> I <br /> DATE: Ja ary 7, 1994 <br /> SUBJECT: Se p tic System Condition <br /> The purpose of ois inspection is to verify the condition of the septic system. Past inspections <br /> have indicated th,t the system is failing and requires replacement. The owner has attempted to <br /> eliminate surface discharge by altering the drainage over the drainfield last summer. If the <br /> alterations have oeen successful, the system should be functioning adequately at this time. <br /> During my insp, tion of the drainfield area, surface discharge was noted emanating from the <br /> distribution box in a puddle approximately 8' long and 3' wide. The corrections have not <br /> improved the fu ction of the drainfield. As this is the driest time of the year, the drainfield <br /> should be dry no w if there is any chance of salvaging the system. <br /> As the attempts o salvage the drainfield area have apparently failed, the system will have to be <br /> replaced next sunnier as soon as weather conditions allow. Soil borings were performed two <br /> years ago by ob Cook which indicated that the existing drainfield does not meet a 3' <br /> separation. A ew site must be designated which will require additional soil testing. <br /> ch <br /> 1 <br />