Laserfiche WebLink
\rzj�yfi City of Orono <br /> biki"ji-oki Zoning Permit Application �7 <br /> O Mailing Address: Permit number. (7.70/ 7 - 6/3/F�l PO Box 66 Date received: /4 '1 <br /> s YO Crystal Bay, MN 55323-0066 <br /> Escrow#and <br /> Street Address: amount: -N <br /> 2750 Kelley Parkway 1�D <br /> Orono, MN 55356 Permit Fee: L c�.lra�er <br /> 1 kES H OV-g" Fax: 952-249-4616 Approved by: <br /> Main: 952-249-4600 Notes: <br /> w*w.ci.orono.mn.us <br /> This application form must be completed in full and all required information must be submitted. (Please print.) <br /> Job Site Address: a�J O Nd Q tilvo W N VL61v C 1 r t N 9935 jp <br /> CONTRACTOR/APPLICANT INFORMATI N: <br /> Name: Stk Ld S Capon01 <br /> Phone: 3 't OU 1 Fax: <br /> Address: r. d • kg City:(AAp_aTA ZIP: 4/1"‘- <br /> Contact Person: ✓11 at t1/ 1`" . Ik Contact's phone number , 3 fig;. d <br /> Email j GCt^15 / /-fa/ Applicant is: ctor ' .meo er (Circle One) <br /> PROPERTY OWNER INFORMATIO <br /> Name: An ILt, 4� + CMCt <br /> Phone(day): (SI Sri ol,� � p ,,1 <br /> Mailing Address: Or/�14V (gteklo�(/14 f4/ 0 Apt_ ZIP: 55 3 , <br /> Email and/or Fax (fit i(4 3 y&N O GAM/ I. <br /> Overall Project Description: Pe fthiu [ all 1/2 Gelid /n1 <br /> Check <br /> Box TYPE OF PERMIT 1 collected when permit is issued <br /> Dock,Commercial $50+engineering review costs <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Dock, Residential — Permanent dock on any lake or initial seasonal dock not on Lake $50+engineering review costs <br /> Minnetonka(permanent dock requires CUP) <br /> Hardcover Permit: Driveway, Patio,Sidewalk,etc. (New or Replacement) No charge <br /> Also requires is a Minor or Major Land Alteration Permit <br /> Land Alteration,Major(grading,filling,or excavating)of more than 500 cubic yards beyond $50 <br /> the lakeshore setback OR more than 50 cubic yards within the lakeshore setback (also <br /> requires Conditional Use Permit) <br /> /Reference: City Code Sections 78-967. 78-1247 and 78-12861 <br /> Escrow for erosion control and engineering review costs As determined by CUP <br /> Land Alteration, Minor(grading, filling or excavating)of 51 to 500 cubic yards beyond the $50+engineering review costs <br /> lakeshore setback OR 50 cubic yards or less within the lakeshore setback <br /> /Reference: City Code Sections 78-967,78-1247 and 78-12861 <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Retaining Walls which exceed two feet in height above existing grade; or result in more $50+engineering review costs <br /> than 20 cubic yards of imported fill; or are located less than five feet from the property line. <br /> Escrow for erosion control and engineering review costs $2,500 <br /> /Reference: City Code Section 78-1405(5.1)1 <br /> Retaining Walls which measure more than four feet(from bottom of footings to top of wall) <br /> require a building permit.Tiered retaining walls are considered one wall unless the walls are <br /> separated by twice the height of the lower wall. <br /> Stairway or Lifts to Lake(New or Replacement) /Reference: City Code Sections 78-12821 $50+engineering review costs <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Structure Permit for other structures 200 if ca less not requiring a building permit but $50+engineering review costs <br /> regulated by the zoning code/Reference: CiivCode Section 86-661 <br /> Escrow for erosion control and engineering review costs $2,500 <br /> Tree Removal or other vegetation removal within 75 feet of lakes o charge. <br /> /Reference: City Code Section 78-12851 f�EC I'VELibre-inspection required. <br /> Temporary Construction Office/Trailer(associated with building permit) OCT 3 $30 <br /> 2017 <br /> CITY OF ORONO <br /> Updated: January 2017 <br /> Updated: January 2017 <br />