Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
'PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: 2-5 Orono Ordure.. IZrd N \Permit No.: 20110 - c070 <br /> Description of work: ]: , -33VVt&h42f polnQ,kf �, (l1( Date Rec'd: <br /> _ / <br /> Septic review by: Date Approved: <br /> Zoning review by: CfiDate Approved: Tc (0 .1 N <br /> Building review by: r "J Date Approved: <br /> Grading review by: Date Approved: �f iG iC <br /> Zoning District: Ke.-6 Zoning File#: Reso #: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF % <br /> Survey Submitted: AYes ❑ No Date of Survey: U -L'(Lo Revised date(?): <br /> Landscape plan submitted? 0 Yes 0 No Landscaper: <br /> Proposed Setbacks: <br /> Front (L71. Rear(S et) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> 20 <br /> Defined Height: Peak Height: FFE: FFE minus 6 feet = (Existing Contour', <br /> Perimeter(linear feet) = 50% = L.F. below grade <br /> Basement? 0 Yes 0 No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest proposed Slab at or above grade <br /> START WITH floor(of the basement or crawl space)and measure from highe xistinq <br /> the highest point of the roof. grade to the highe t point of the <br /> START WITH roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION • GABLE HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windo ): Subtract half the distance from highest existing grade to the <br /> ROOF TYPE) between the highest point of the roof highest point of the roof. <br /> to the low point of the corresponding If you have a... <br /> gable or hipped roof • OR HIPPED ROOF <br /> SUBTRACTI (no windows): Subtract half <br /> • GABLE OR HIPPED ROOF(with (BASED O <br /> windows): Subtract half the distance ROOF E) the distance between the <br /> highest point of the roof to <br /> between the top of the highest the low point of the <br /> window and the highest point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SU8TRACTION Subtract the distance between the half the distance between <br /> (BASED ON basement/crawl space floor and the the top of the highest <br /> XISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: May 2016 <br /> z:\forms\plan review checklist 5-2016.docx <br />