Laserfiche WebLink
t r <br /> Keep all heavy uipment Off of the proposed treatment area before and after <br /> construction. Th: treatment area should be marked off before construction. This <br /> Design is not vali. &the system will need to be relocated if failure to protect the areas <br /> proposed for On-•ite Sewage Treatment occurs. <br /> Nothing other tha human waste, toilet tissue, laundry, showers, water softener etc. <br /> should be dispos:d of into the septic tanks. Iron filters must be diverted out of the <br /> system. Recom -nd to divert the water softner also. Garbage disposals are not <br /> recommended, d - to adding more solids &fine solids passing through to the system. <br /> Excessive amoun s of soaps, anti-bacterial soaps, cleaning agents, shower cleaners <br /> used every sho =r& chlorine agents may kill the bacteria needed to treat septic <br /> effluent. Additive- are not recommended. The trash trap, Multi-Flo and pumping <br /> chamber will n- . to be pumped out when the setable solids reach 50% in the unit. <br /> This will be dete fined at the time of the services. Recommend laundering be limited <br /> to 3 to 4 loads pe day. Recommend to turn off your water when you are on vacation or <br /> not home for a pe iod of time. <br /> 57tee- <br /> Steven B. Schir - <br /> 3 <br />