My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: LA permit application
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Road North
>
025 Orono Orchard Road North - 35-118-23-33-0004
>
Correspondence
>
Re: LA permit application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:30 PM
Creation date
5/9/2018 10:47:17 AM
Metadata
Fields
Template:
x Address Old
House Number
25
Street Name
Orono Orchard
Street Type
Road
Street Direction
North
Address
25 Orono Orchard Road North
Document Type
Correspondence
PIN
3511823330004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . <br /> (-i„ 0 4". <br /> 0 4 0 <br /> vA S `,, �� <br /> CITY of ORONO <br /> ",�'+� , ` Y ,,As Municipal Offices <br /> �t �, ,� Street Address: Mailing Address: <br /> -keno- 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> July 21, 2008 <br /> Mike Benedict <br /> 25 Orono Orchard Road <br /> Long Lake MN 55356 <br /> Re: Land Alteration Permit(Application# 12166) <br /> Dear Mr. Benedict: <br /> As I indicated in our telephone conversation the City's wetland protection regulations require that a wetland <br /> buffer be created in conjunction with a construction or land alterations project when all of these conditions exist: <br /> 1. The portion of the property disturbed by construction or land alteration activity drains to the wetland. <br /> 2. The amount of grading exceeds 50 cubic yards or involves the disturbance of more than 5,000 square <br /> feet. <br /> 3. There is a net inbrease in impervious surfaces that drain to the wetland, new impervious surface is added <br /> closer to the wetland than existing impervious surfaces, or there is a change in drainage patterns that the <br /> City Engineer determines will increase the velocity or rate of runoff to the wetland. <br /> Since you indicated you had restored your wetland I had the City's wetland consultant visit your property to <br /> ensure the wetland buffer area satisfied the City's requirements. His report is attached. The use of buffer <br /> averaging is acceptable. <br /> All that will be required 's a wetland buffer easement and protective covenant. The document is enclosed.You <br /> will need to provide leg 1 descriptions of the wetland and the wetland buffer as well as a survey showing <br /> location of the buffer an that its area is not less than the area of a standard 35 foot wide buffer. There can be no <br /> impervious surface withi the buffer. Once we have this the permit will be issued. <br /> If you should have any questions feel free to contact me at 952-249-4623 or eturner@ci.orono.mn.us. <br /> Sincerely <br /> Eve n Turner <br /> City Planner <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.