Laserfiche WebLink
3) Your direction as to whether Stantec can proceed to incorporate the installation of the pressure sewer line into <br /> the plans currently being drafted by Stantec for the MCES forcemain project. The City would bear any additional <br /> design and construction costs and assess them to the property owner. <br /> Please don't hesitate to contact me if you have any questions. Thanks for your assistance on this! <br /> Mike <br /> Michael P.Gaffron <br /> Assistant City Administrator/Long Term Strategy <br /> City of Orono <br /> (Street Address)2750 Kelley Parkway <br /> (Mailing Address) P.O.Box 66,Crystal Bay,MN 55323 <br /> Phone:(952)249-4622 <br /> Fax: (952)249-4616 <br /> From: Hanson, Phyllis f mailto:Phyllis.hanson@metc.state.mn.usl <br /> Sent: Monday, February 06, 2012 3:43 PM <br /> To: Mike Gaffron <br /> Cc: Caswell, Tom; Colvin, Kyle <br /> Subject: Orchard Road consideration for sewer email <br /> Mike, <br /> Tom Caswell is out ill today and forwarded your email request to Kyle Colvin and me. As I understand city staff are in <br /> receipt of an informal request from a residential neighborhood along Orchard Road to consider retrofitting this area of <br /> 15 existing homes(no vacant lots, no subdividable lots)with municipal sewer. In addition you are meeting with a <br /> neighborhood representative this Wednesday and would like some direction. <br /> At this time, without more information including a map showing the lots, condition of the existing septic systems, etc., it <br /> is not possible to determine how this would be handled through our MUSA expansion. On the surface it seems that this <br /> would require inclusion into our 3 unit per acre calculation and requirements. If you would like after your meeting to <br /> discuss this further, please let us know and we would be happy to sit down with the City staff. <br /> Hope this helps, <br /> Phyllis Hanson <br /> Manager of Local Planning Assistance <br /> 651-602-1566 <br /> 2 <br />