Laserfiche WebLink
• <br /> Jack & Lisa Hauser Date: 1/20/99 <br /> 1555 Orono Oaks Drive Rev : 1/25/99 <br /> ',Orono, Minnesota <br /> 55356 <br /> Job# 1098036 <br /> SCOPE OF PROJECT: <br /> Lower level Guest Room and Bathroom remodel. <br /> Guest Bathroom <br /> Remove existing rIumbing fixtures(save stool, remaining to be hauled away). <br /> Q Remove existing mirror and haul away. <br /> d Remove existing cabinets and countertops and haul away. <br /> n Remove existing blase trim and haul away. <br /> [] Remove existing ceiling(sheetrock) and haul away. <br /> Q Remove existing wall finish(sheetrock) to framing and haul away. <br /> Remove existing flooring(ceramic) and haul away. <br /> n Remove existingII and door as indicated by shading on existing /demo plan <br /> and haul away <br /> 0 Install 3 1/2" FF insilation in ceiling for sound. <br /> 1.a Remove existing dor(throw) and install, (per C/O) <br /> 2'4"x6'8" 6 Panel solid core colonist prehung door <br /> * Rough opening 2'6"x6'10". <br /> * Jamb size: 4 9/16" due to new 2x4 stud walls. <br /> * Door swing per plan. (if swing changes adjust electric) <br /> * Hardware: Schlage Flair passage lockset. <br /> * Trim: Oak princeton casing. <br /> 1. Vanity cabinet: <br /> * Install new MDFdoors (per C/O) on existing cabinet to remain. Enamel <br /> exterior to match millwork. <br /> Page 1 of 6 <br />