My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-011727 - new septic
Orono
>
Property Files
>
Street Address
>
O
>
Orono Oaks Drive
>
1555 Orono Oaks Drive - 35-118-23-33-0007
>
Septic
>
1999-011727 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:31 PM
Creation date
5/4/2018 1:37:38 PM
Metadata
Fields
Template:
x Address Old
House Number
1555
Street Name
Orono Oaks
Street Type
Drive
Address
1555 Orono Oaks Drive
Document Type
Septic
PIN
3511823330007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE RE DI'.TRIB I• Y T M <br /> ar __) <br /> 1. Select number of perfo ated laterals 2 tf.34. Aee..14 <br /> 2. Select perforation spacing = 3 ft. <br /> 3. Since perforations shold not be placed closer than 1 ft. to <br /> the edge of the rock la r (see p. F-14), subtract 2 ft. from the <br /> rock layer length. <br /> RcKk lave length - 2 ft. = <br /> ft. <br /> 4. Determine the number f spaces between perforations. <br /> Divide the length abov by perforation spacing and round _ E-17a <br /> down tO nearest whole number. TABLE OF PERFORATION DISCHARGES IN G".' <br /> Head Perforation diameter(inches) <br /> Length perf. spacing = ED ft. s 3 ft. = / 0 spaces 114 <br /> (3) (2) 1.0a 0.56 0.74 <br /> 1.5 0.6 0.90 <br /> 5. Number of perforation'. is equal to one plus the number of 2.0b 0.8u 1.04 <br /> 2.5 039 1.17 <br /> perforation spaces . 3.0 0.93 1.23 <br /> 4.0 1.13 1.47 <br /> 5.0 1.26 1.65 <br /> / 0 spaces + 1 = perforations/lateral aUse 1.0 foot of head for residential systems. <br /> bUse 2.0 feet of head for other establishments <br /> 6. Multiply perforations :ser lateral by number of laterals to <br /> get total number of per orations. E-17b <br /> (j7 / Mammas JIwmW reW N pr=se roue a p.korai te <br /> llllFF�� Nnsr<I;41=1: <br /> *Aelge r�nrae <br /> laterals x perfs/late al Perforations. win°. 1.25 inch 1.5 inch I 2.0 inn <br /> 2.5 14 18 ' 28 <br /> 7. Determine required , low rate by multiplying 3.0 13 3.3 12 17 1 26 <br /> number of perforations by flow per perforation 4.0 11 15 23 <br /> (see page E -17) 5.0 10 14 22 <br /> (o(o <br /> n <br /> perkX r/;.•-fir r:;. E-15 <br /> a.........oh Oe a...Ewa 0eh. ne,a•y'•r <br /> 8. If laterals are connecte. to header pipe as shown on page E- <br /> 15, select minimum re. ired lateral diameter from table on <br /> page E-17; enter table 'ith perforation spacing and number _,....--- a'v- <br /> of perforations per late -1. Select minimum diameter for ��' <br /> perforated lateral = inches. <br /> F-12 <br /> .11 <br /> 9. If perforated latera: sy�s em is attached to manifold pipe near �"��' <br /> the center, a.!-, on page :-12, perforated lateral length and "' r ' <br /> number of perforations per lateral will be approximately one "�- <br /> ".QL3 <br /> half of that in step 8. Using these values, select minimum __ . ,,,, <br /> diameter for perforate. lateral from page E-17 as \---.•"- <br /> ...--- <br /> ,,,.-'` -" <br /> inches. <br />
The URL can be used to link to this page
Your browser does not support the video tag.