My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00655 - new septic
Orono
>
Property Files
>
Street Address
>
O
>
Orono Oaks Drive
>
1350 Orono Oaks Drive - 35-118-23-34-0006
>
Septic
>
2010-00655 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:51 PM
Creation date
5/4/2018 1:03:11 PM
Metadata
Fields
Template:
x Address Old
House Number
1350
Street Name
Orono Oaks
Street Type
Drive
Address
1350 Orono Oaks Drive
Document Type
Septic
PIN
3511823340006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> PUMP SELECTION PROCEDURE <br /> 1. Determine pump capacity: <br /> .--:,.,A. Gravity distribution <br /> 1. Minimum required discharge is 10 gpm <br /> 2. Maximum suggested discharge is 45 gpm. For other <br /> establishments at least 10%greater than the water supply rate, <br /> but no faster thane rate at which effluent will flow out of the <br /> distribution device. <br /> B. Pressure distrib tion <br /> See pressure distri ution work sheet <br /> From A or B. Selected pump capacity: 3 4 gpm <br /> 2. Determine pump;head requirements: <br /> A. Elevation difference between pump and point of discharge? soil treatment system <br /> j. ') feet &p.nt discharge <br /> B. Special head requirement?(See Figure at right-Special Head Requirements) total pipe <br /> S feet leng <br /> 2A.elevation <br /> inlet e=�'�3' '` difference <br /> C. Calculate Friction loss pipe <br /> 1. Select pipe diameter . 0 in <br /> 2. Enter Figure E-9 witli gpm(lA or B) and pipe diameter(Cl). -'--=°'°"" <br /> Read friction loss in fret per 100 feet from Figure E-9 _Special Head Requirements <br /> Friction Loss= t." ft/100ft of pipe Gravity Distribution 0 ft <br /> 3. Determine total pipe length from pump discharge to soil treatment Pressure Distribution 5 ft <br /> discharge point.Estimate by adding 25 percent to pipe length for <br /> fitting loss. Total pipe length times 1.25=equivalent pipe length <br /> `� feet E-9: Friction Loss in Plastic. Pipe <br /> +"f D feet x 1.25 = Per 100 feet <br /> 4. Calculate total friction loss by multiplying friction loss (C2) nominal <br /> in ft/100 ft.by.,the equivalent pipe length(C3) and divide by 100. pipe diameter <br /> = ,to ft/100ft x 4`6 +100= a, ft <br /> flowrate1.5" 2" 3" <br /> D. Total head required is the sum of elevation difference(A),special 20 2.47 0.73 0.11 <br /> head requirements (B),and total friction loss (C4) 25 3.73 1.11 0.16 <br /> l ft+ 6r ft+ a ft= 30 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> Total head: a4 feet 40 8.9134 0.39 <br /> 45 11.07 3.2a 0.48 <br /> 3. Pump selection �, <br /> 50 13.46 3.99 0.58 <br /> 55 4.76 0.70 <br /> A pump must be selected to deliver at least 3 B gpm 60 5.60 0.82 <br /> (1A or B)with at least .t.9.. feet of total head (2D) 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> I hereby certify that ave completed this work in accordance with applicable ordinances, rules and laws. <br /> ---_ (7)- ,,e.-/:---- - (signature) 3(1)/ cj' (license#) 53 -13-0% (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.