My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-005570 - new septic
Orono
>
Property Files
>
Street Address
>
O
>
Orono Oaks Drive
>
1290 Orono Oaks Drive - 35-118-23-34-0018
>
Septic
>
1993-005570 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:19 PM
Creation date
5/4/2018 11:15:04 AM
Metadata
Fields
Template:
x Address Old
House Number
1290
Street Name
Orono Oaks
Street Type
Drive
Address
1290 Orono Oaks Drive
Document Type
Septic
PIN
3511823340018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> May 19 , 1992 <br /> Nancy Bordson <br /> Lot 3 , Block 1 <br /> Orono Oaks <br /> Orono, Henn. Co. , MN <br /> This On-Site Sewage Treatment System is Designed for a Type 1 , four <br /> bedroom home in accordance with the Minnesota Pollution Control <br /> Agency Chapter 7080 and local ordinances . . <br /> The soils on this site are SCS soils mapped - EnB - Erin loam. A <br /> seasonally high water table was located at 12" to 22" , (mottled <br /> soil ) . Due to the seasonally high water table, a Pressurized <br /> Mound system will need to be installed. The bottom of the rock <br /> bed must be located at least 3 ' above the seasonally high water <br /> table. The future expansion area will• be located on 6% to 10% slopes , <br /> (rock bed 6% to 8%) . This will need to be approved by City Officials . <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 14 . 4 min/inch and are adequate for treating septic effluent. <br /> A pumping chamber will need to be installed to lift the effluent to the <br /> treatment area . <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber. The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over, just break up the sod, be sure <br /> not to over work. <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure. A warning device must <br /> be installed with a light and sound device, this is in case of a pump <br /> failure. Mercury floats are a good method. <br /> All neighboring wells are located greater than 100 ' away from the <br /> proposed treatment area . <br /> CONT ' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.