Laserfiche WebLink
o <br /> 4, <br /> • A <br /> \\ <br /> • „) CITY of ORONO <br /> x ! Municipal Offices <br /> Street Address: Mailing Address: <br /> 414i 2750 Kelley Parkway P.O. Box 66 <br /> �E380 Crystal Bay,Orono, MN 55356 MN 55323-0066 <br /> To: The Current Owner of Address /, /0 0(0/U0 CA K3 <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No <br /> If yes, system;must be brought into compliance by: <br /> December 31, 2007 <br /> Decembers 31, 2010 <br /> Other <br /> Septic Tanks mp out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> /30 . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> 4,4)2114—e, <br /> Inspector: Date of Inspection f e1 •U <br /> Telephone (952) 249-4600 0 Fax (952) 249-4616 <br /> www.ci.orono.mn.us <br />