My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06965 - septic
Orono
>
Property Files
>
Street Address
>
O
>
Orono Oaks Drive
>
1230 Orono Oaks Drive - 35-118-23-34-0019
>
Septic
>
2003-P06965 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:21 PM
Creation date
5/4/2018 10:22:33 AM
Metadata
Fields
Template:
x Address Old
House Number
1230
Street Name
Orono Oaks
Street Type
Drive
Address
1230 Orono Oaks Drive
Document Type
Septic
PIN
3511823340019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELECTION PROCEDURE <br /> 1. Determine pump capacity: <br /> -...A. Gravity distribution <br /> 1. Minimum required discharge is 10 gpm <br /> 2. Maximum suggested discharge is 45 gpm. For other <br /> establishments at least 10%.greater than the water supply rate, <br /> but no faster than the rate at which effluent will flow out of the <br /> distribution device. <br /> B. Pressure distribution <br /> See pressure distribution work sheet <br /> From A or B. Selected'pump capacity: ygpm <br /> 2. Determine pump head requirements: <br /> A.Elevation difference between pump and point of discharge? soil treatment system <br /> 1 feet &p.Int of discharge <br /> B.Special head requirement?(See Figure at right-Special Head Requirements) total •Ipe <br /> leng <br /> S feet 2A.elevation <br /> inlet a,.;t>s::,,_;,; <br /> difference <br /> C. Calculate Friction loss • pipe <br /> 1. Select pipe diameter a.t0 in <br /> 2. Enter Figure E-9 with gpm(lA or B)and pipe diameter(C1). <br /> Read friction loss in feet per 100 feet from Figure E-9 Special Head Requirements <br /> Friction Loss= 3i-Cd ft/100ft of pipe Gravity Distribution 0 ft <br /> 3. Determine total pipe length from pump discharge to soil treatment Pressure Distribution 5 ft <br /> discharge point.Estimate by adding 25 percent to pipe length for <br /> fitting loss.Total pipe length times 1.25=equivalent pipe length E-9: Friction Loss in Plastic Pipe <br /> 0 feet x 1.25 = a.s0 • feet Per 100 feet <br /> 4. Calculate total friction loss by multiplying friction loss(C2) nominal <br /> in ft/100 ft.by.the equivalent pipe length(C3) and divide by 100. pipe dieter <br /> = 3• ft/100ft x aS) +100= )6 ft flow rote 1.5. <br /> 2am" 3" <br /> gpm <br /> D. Total head required isthe sum of elevation difference (A),special 20 2.47 0.73 0.11 <br /> head requirements.(B),and total friction loss (C4) 25 3.73 1.11 0.16 <br /> )"D.- ft+ ft+ 1i ft= 30 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> Total head: a 0 feet 40 8.91 2.64 0.39 <br /> 3 45 11.07 3.28 0.48 <br /> . Pump selection <br /> 50 13.46 3.99 0.58 <br /> 55 4.76 0.70 <br /> A pump must be selected to deliver at least 4' gpm 60 5.60 0.82 <br /> (1A or B)with at least 7 feet of total head (2D) 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> - I hereby certify that I hav ompleted this work in accordance with applicable ordinances, rules and laws. <br /> 66. (signature) (license#) -) -03 (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.