Laserfiche WebLink
CITY OF ORONO QoSF PTJigqpTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 GUY OF <br /> JOB SITE ADDRESS: /c)?S 0/-0,36 O s <br /> Occupancy Type: Residential X Commercial Other <br /> Permit Type: L New S Replacement System, 0100.00) <br /> Repair Existing System, $ 50.00 <br /> 0.5;Ciliate surcharge added to above fees /OD -I° <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: AN 1 E L S Phone Number: <br /> Mailing Address: S.t,V,s City: Zip: <br /> Contractor's Name: /9',979 /// 1-; JCQ,,`}rbJ Vic, PhoneNumber: G,/,„) _FL3 q1 <br /> Mailing Address:/SSS S. 5 ,,/;,,1 Sf City: S*A u ( Zip: 5-57/ <br /> ) <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. <br />