Laserfiche WebLink
IOn the North Shore of <br /> ON-SITE SEWAGE TREA MENT CITY Lake Minnetonka <br /> INSPECTION REPO T0 POST OFFICEBOX 66 <br /> I O R O N O 1335S. Brown Rd. <br /> Crystal Bay, MN 55323 <br /> 473-7357 <br /> OWNER 1 0- YI C ADDRESS IOC v/a' 0.41& Yr' <br /> PERMIT NO.'S. AV ' DATES / CONTRACTORS /� �q <br /> City Ordinance No. 210 requi s that each on-site sewage treatment system in Orono be inspected on a regular basis.The on-site sewage <br /> treatment system at the above addre : has been inspected and appears to fall into the category checked below. <br /> (This is 0 an exist ng system 0 new construction) <br /> 1 Meets or exceeds cu(rent City standards in all respects relating to design,construction,and location.Appears to be operating <br /> properly. <br /> 0 2 Does not meet all current City standards for new construction (1978 Code) but in most respects appears to be designed, <br /> located, and constructed generally in accordance with previous codes.System appears to be functioning properly;no major <br /> upgrading of the system is required at this time. <br /> 0 3 Does not meet current City standards in many respects relating to design,construction,or location.Appears to be operating <br /> adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br /> this time. <br /> l <br /> 4 System may or may not meet current City standards for design,construction or location,but is failing to properly treat and <br /> dispose of the current input,and is endangering a water supply,or is a source of pollution to surface or groundwaters,or is <br /> creating a safety hazaid,or is otherwise creating a public nuisance.Please contact the City Inspector to discuss system repair/ <br /> replacement procedures. If drainfield replacement is necessary,soil testing will usually be required,aid a design and site plan <br /> must be submitted for review.Your contractor must obtain a permit before work is started. <br /> SYSTEM CONDITION ( m Checked items may require your action) <br /> Tank'nspection indicates: 0 Inspection pipe is located directly over tank baffle.(Does not <br /> Pumpout not needed at this time. give accurate measurement of solids accumulation.) If tanks <br /> ❑ Solids accumulation in tanks indicates they should be pump- have not been pumped out within the last three years,they <br /> ed out this year to help prevent future problems. " should be pumped out now. <br /> ❑ Solids accumulation in tanks iso at a critical level. Tanks DraMiield inspection indicates: <br /> should be pumped out as soon as possible. ig5 Drainfield is dry,no surfacing evident. <br /> ❑ System is discharging to surfaca4 Tanks must be pumped 0 Some evidence of surfacing,not critical yet. <br /> within 48 hours to eliminate surface discharge. 0 Drainfield is saturated and visibly discharging untreated <br /> ❑ Inspection risers missing—tanks 'could not be inspected, effluent to the surface. This condition may require replace- <br /> Inspection risers (4" dia. pipe)mast be installed in each tank ment or additions to drainfield. Contact the City Inspector <br /> at next pumpout. If tanks have not been pumped out within immediately.Repairs must be completed yvithin 90 days. <br /> the last three years,they should be pumped out now. 0 Drainfield extent and condition unknown. <br /> SITE CHARACTERISTICS: - <br /> Limiting Site Factors Potential for.System Failure Site Capabilities for <br /> ❑ Slope (depends on soil types,water Putuu a Expansion <br /> ❑ Soil table and system condition) 0-Adequate <br /> ❑ High water table Low 0 Fair <br /> ❑ Lot size 0 Medium 0 Poor <br /> ❑ Lake,wetland,or stream 0 High 0 Inadequate <br /> ❑ Drainage 0 System is causing visible <br /> surface discharge. <br /> COMMENTS: <br /> 1 <br /> Z6/O <br /> . 1"..46441 ..... <br /> Date of Inspection ptic System Inspector <br /> 'ote: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be advised that <br /> is report does not guarantee or certify that an existing system will continue to function properly,but is merely an opinion of the adequacy <br /> the system under current conditions based on the available information. <br /> This report must be kept on the premises with system location and pumping records. , <br /> WHITE COPY/lfspector's File GOLD COPY/Homeowner <br /> 1 <br />