My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including 2003 design
Orono
>
Property Files
>
Street Address
>
O
>
Orono Oaks Drive
>
1200 Orono Oaks Drive - 35-118-23-34-0020
>
Septic
>
septic info including 2003 design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:24 PM
Creation date
5/3/2018 1:05:14 PM
Metadata
Fields
Template:
x Address Old
House Number
1200
Street Name
Orono Oaks
Street Type
Drive
Address
1200 Orono Oaks Drive
Document Type
Septic
PIN
3511823340020
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING, INC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (763) 497-3566 <br /> FAX (763)-497-5011 <br /> State License #394 <br /> June 16, 2003 MVO?ORONO <br /> M212fVeltIMMO <br /> ' p. v� <br /> must <br /> 11V10411111111 <br /> MN/DOT amscilara None <br /> OTRAPICTOVSINCORIUICT*U$VRMi1' <br /> 1200 Orono Oaks Dr. <br /> 'ArwwwuiMw lit per Mme► An work.AA 6r de* <br /> Orono, Henn. Co., MN I.am orepliows* wide fed mist <br /> $aW''M4!*% ONO $ATMl.pan*solid rriir+wMry. <br /> The existing on-site sewage treatment system is located in the construction limits for <br /> State Highway 12. The existing tanks may be used if water tight. <br /> This on-site sewage treatment system is designed for a Type 1, three bedroom home, <br /> in accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are a clay loam. The seasonally saturated soils were located at <br /> 14" to 20" (mottled soil). Due to the seasonally saturated soils, a Pressurized Mound <br /> System will need to be installed to treat septic effluent. The bottom of the rock must be <br /> located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate of 20.0 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.