My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01660 - demolition
Orono
>
Property Files
>
Street Address
>
F
>
Fox St
>
1390 Fox St - 02-117-23-31-0010
>
Permits/Inspections
>
2017-01660 - demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:54 PM
Creation date
5/2/2018 2:47:53 PM
Metadata
Fields
Template:
Address
House Number
1390
Street Name
Fox
Street Type
Street
Address
1390 Fox St
Document Type
Permits/Inspections
PIN
0211723310010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Submit a $2,500 escrow and an escrow agreement signed by the property owner(copy attached). <br /> 5. Keep all structure(s) enclosed and/or secured until such time as demolition is complete. <br /> 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior <br /> approval is obtained in writing for temporary use thereof. <br /> 7. Completely remove foundation(s)from the ground. <br /> 8. Completely dispose of all demolition debris off site in accordance with all applicable PCA requirements. <br /> 9. Abandon water wells in accordance with State Health Department regulations. <br /> 10. Call for an inspection when all debris has been removed, before backfilling. <br /> 11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site shall be <br /> left clean and clear of all debris, with any excavation filled with earth level with the adjacent ground <br /> elevation (except when such excavation is to be used as part of a new building and such new building is <br /> actually under construction). <br /> 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed <br /> and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are <br /> crushed and filled. <br /> 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, <br /> employees and assigns from and against all claims, damages, losses or expenses, including attorney <br /> fees, against the City, its agents, employees and assigns arising out of or resulting from the demolition <br /> described herein as performed by the property owner, his employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> I✓ $75.00 - Principal Structure $ 75.00 <br /> 1! $50.00 -Accessory Structure x i (how many) $50.00 <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge 1.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ $?5 /2L ' <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do <br /> all the work in a strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are complete, true and correct. <br /> Applicant's Signature: At,/ Date: 12/8/2017 <br /> Owner's Signature: r�; C� � _ a > Date: 104 <br /> Approved By: ����f`;/ Date: 2 � <br /> Building Officia <br /> * Zoning Disclosure Required? t. ' ES 641 NO 5- .x-- LA I r -0000I y' <br /> *This must be filled out by Zoning Department� n -For either answer, a Zoning Official must sign all applications. <br /> * Approved By: Date: 3'2-(0*I <br /> (Zoning Official) <br /> Form Last Updated: July 2015 <br /> 150784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.