Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Wednesday, March 21, 2018 2:33 PM <br /> To: Christine Mattson; Laura Oakden; Melanie Curtis;Jeremy Barnhart; Roger Peitso <br /> Subject: 2018-00317/3555 Crystal Place <br /> Planners, miscellaneous <br /> Not sure who put this on in my inbox. I assume I was to review the grading plan which I did. <br /> I stamped the grading plan approved with the following comments: <br /> 1. Perimeter sediment control measures must be installed by the contractor and inspected by the City prior to any <br /> work, including demolition. Contractor must provide minimum 24 hour notice prior to inspection. <br /> 2. Special care will need to be exercised in creating the drainage pattern on the sides of the property to ensure <br /> that run off is not directed onto the neighboring properties. <br /> 3. Street cleaning-Streets shall be cleaned and swept within 24 hours whenever tracking of sediments or soils <br /> occurs and before the site is left idle for weekends and holidays. <br /> 4. Driveway requires paving from roadway for 30 ft. in order to reduce driveway drive way runoff depositing soil <br /> and debris upon the roadway. Orono municipal code Sec 18-136 (f). <br /> 5. A separate utility permits will be required for the sewer and water disconnections prior to demolition and for <br /> connections. <br /> 6. The grading plan survey does no depict the public utilities. The sanitary sewer service appears to be <br /> approximately located under the proposed driveway. See sewer as built excerpt below. The water stub is <br /> located in vicinity of the culvert. <br /> mkt <br /> .d _ <br /> 50 . 50 50 <br /> 40- <br /> Q J 0J + tin. <br /> [1:19 <br /> Adam <br /> Adam T. Edwards, P.E. <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952)249-4661 <br /> aedwards@ci.orono.mn.us <br /> 1 <br />