Laserfiche WebLink
Builder Acknowledgement Form <br /> Permit #2018-00317 / 3555 Crystal Place <br /> Builder Representative Name: 1c--(A)-iv lC-- <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order 2 <br /> will be issued. <br /> Schedule a minimum of one hour for the framing inspection. <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must <br /> remain until vegetation has been established. P_-- <br /> Street Cleaning—Streets shall be cleaned and swept within 24 hours whenever tracking of <br /> sediments or soils occurs and before the site is left idle for weekends and holidays. <br /> Driveway requires paving from roadway for 30 feet in order to reduce driveway runoff (� <br /> depositing soil and debris upon the roadway. Orono Municipal Code Section 18-136(f). <br /> Separates utility permits are required for the sewer and water connections. <br /> The grading plan/survey does not depict the public utilities. The sanitary sewer service appears <br /> to be approximately located under the proposed driveway. See sewer as-built excerpt below. <br /> The water stub is located in vicinity of the culvert. <br /> N <br /> 50 <br /> 50 <br /> 1'144 OD- <br /> 4. <br /> D® <br /> ore <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations 7---7 <br /> must be submitted and approved. <br /> In the event of winter or other extended unfavorable weather conditions(which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. t— <br /> w:\street files\crystal place\3555\builder acknowledgement form 2018-00317.docx <br />