Laserfiche WebLink
Builder Acknowledgement Form <br /> Permit #2016-00543/1380 Orono Ln <br /> Builder Representative Name: /V4 /(/) ti rZ ll , <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order Nfr-\ <br /> will be issued. <br /> Schedule a minimum of one hour for the framing inspection. <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to ! n� <br /> inspection. (v ✓ <br /> Erosion control shall be installed and maintained throughout the entire project and must <br /> remain until vegetation has been established. N/\ <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning n/ /,\ <br /> and repair of roadways for any adverse impacts. !� <br /> No underground sewer within 20 feet of well. <br /> Niv\ <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations A � <br /> l <br /> must be submitted and approved. / V <br /> In the event of winter or other extended unfavorable weather conditions (which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of ` I f�, <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. IBJ <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a <br /> separate Zoning Permit application to be submitted and approved prior to the work l ht-\ <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and j\J <br /> (r�-\ <br /> approved prior to construction. 1 <br /> w:\street files\orono lane\1380\builder acknowledgement 2016-00543.docx <br />