My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-005688 - septic system
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
745 Orchard Park Road - 31-118-23-11-0003
>
Septic
>
1993-005688 - septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:19 PM
Creation date
5/1/2018 1:49:38 PM
Metadata
Fields
Template:
x Address Old
House Number
745
Street Name
Orchard Park
Street Type
Road
Address
745 Orchard Park Road
Document Type
Septic
PIN
3111823110003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Koch's Soil Testing <br /> P.O. Box 81 <br /> Loretto, MN 55357 <br /> TO (612) 479-2637 <br /> To: Larry Anderson <br /> 1909 Shorewood Ln H 472-6262 <br /> Mound, Mn 55364 W 472-5580 <br /> Job: 745 Orchard Park Rd <br /> GENERAL INFORMATION <br /> This on site sewage treatment system is designed for a <br /> type I 4 bedroom home or 600 gal/day maximum. <br /> Construction should be started only after reviewal by <br /> local building inspector and after obtaining the permit. <br /> Construction should be done in accordance with the <br /> Minnesota Pollution Control Agency charter 7080 and local <br /> ordinances by a M.P.C.A. certified contractor. <br /> The soils on this site are mapped as Erin clay loam. <br /> Mottling indicates a seasonally saturation soil at 28" . <br /> Therefore a pressurized mound will need to be installed. The <br /> mound rock bed must be installed at least 3 ' above this <br /> seasonally saturated soil. <br /> , The soils at a depth of 12" have a percolation rate <br /> averaging 400Iminutes per inch and are adequate for treating <br /> septic effluent. <br /> NOTES <br /> Keep all heavy equipment off the proposed treatment area <br /> before and after construction as much as possible. The <br /> treatment area must be marked off before construction. <br /> SOIL SURFACE PREPARATION <br /> The discharge pipe from the pump ic) the mound area shall <br /> be installed before soil surface prepa'.ation. The trench <br /> excavated to install the discharge pipFi shall be carefully <br /> backfilled and compacted to prevent se,,Inage of effluent. <br /> The total area selected for the mound, including that <br /> under the dikes, shall be roughened to thoroughly break up <br /> any existing sod layers and to provide a suitable transistion <br /> zone between the original soil and sand layer of the mound. <br /> The area shall be roughened only when the moisture content of <br /> the soil 8 inches below the surface is drier than the plastic <br /> limit. Back hoe teeth may be used to rtughen the soil surface <br /> and break up the sod layer. Care must to taken so as not to <br /> compact or puddle deeper soil layers . Tn no case shall any <br /> surface soil be excavated and removed „_rom the area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.