Laserfiche WebLink
I <br /> SECTION 3 <br /> II Solid Endwall Assembly <br /> Purlin Assembly <br /> I <br /> ..N�� Figure 3-7 and <br /> ► �� � % %XN .��.N 9. Figure 3-8 <br /> •_,#,-7.:ammwomman,....;............ I. .- N- il <br /> �0► <br /> Figure• iI <br /> Figure 3-11 <br /> ;► 3-10 \ p 9 <br /> Figure 3-9 <br /> I <br /> L <br /> I • 112" <br /> wood grip <br /> • <br /> N,/0 > <br /> screws <br /> I Purlin �NI � <br /> 12"Bolts i i <br /> 2"for 2x4 <br /> girts and <br /> I 4"for 2x6 <br /> Make sure all columns are plumb, level, and square ColumnEll 4 <br /> before fastening the purlins to rafters. Install purlins <br /> I in the truss clips, using 1 1/2"wood grip screws as Figure 3-9 <br /> shown in Figure 3-7. Install wood grip screws in <br /> alternate sides of the clip(Figure 3-8). Extend purlins PurlinI <br /> beyond the endwall rafter as shown in Figure 3-9 and <br /> Figure 3-10. Figure 3-11 shows endwall Purlin i �t �� <br /> placement at eave height. ‘, 1/0.1—T- <br /> 11 <br /> ` �� <br /> I ' <br /> Column <br /> I <br /> I ~ Rafter <br /> Figure 3-10 <br /> 112"wood Purlin <br /> grip screws Rafter 4ti <br /> 112" — '�tI <br /> wood grip �r R <br /> Purlin ` wood �� \ <br /> I �_ �" i r Purlin <br /> I Steel clip _1 Column 1 "+ <br /> 1 � <br /> Figure 3-7 Figure 3-8 Figure 3-11 <br /> ICOD-96 12 ©Miracle Steel Structures,Inc. 1996. <br />