Laserfiche WebLink
• • Plan Review Checklist for New Structures / Additions <br /> Address/PID/Legal: (at0 ORC-k-kAWO PARK( LeA. ) <br /> Description of work: i ..fWoo£L- <br /> Septic review:by: Date Approved: <br /> Zoning review by: N/4 Date Approved; <br /> Building review by: Date Approved: t 0=26 • La I Z <br /> Grading review by: N//4- Date Approved: <br /> Zoning File#: Resolution#: Resolution Date: <br /> Zoning District Fire Department Post Office School District <br /> Zonis•• Lot Area: SF/AC Width: Dept <br /> Survey S emitted: D Yes 0 No Date of Survey: <br /> Proposed Set.-cks: <br /> Front (Lake) Rear(Street) ( 'N S E 'W ) -( N S E W ) • erBuildings Wetland <br /> Side Side <br /> Building;Defined Height Building Peak Height #of Stories Ok?: 0 YES <br /> FOR A BUILDING WITH ABASEMENT OR C-:•WL SPACE: F•- A BUILDING ON A SLAB FOUNDATION: <br /> START WITH the distance between the b ement floor/crawl START the distance between the slab and-the highest <br /> space floor and the highest ro• •eak,,the top of WITH roof peak,the top of the cornice of a flat roof, <br /> the cornice of a flat roof,the dec' 'ne of a the deck line of a mansard roof,or the <br /> mansard roof,,or the uppermost poi on a;roun• uppermost point on a round or other arch-type <br /> or other arch-type roof roof <br /> SUBTRACT half the distance between the highest win.• and SUBTRACT half the distance between the highest window <br /> highest roof peak of a pitched roof and highest roof peak of a pitched roof <br /> SUBTRACT the distance between the basement fl••r/craw ADD the distance between theslab and the highest <br /> space floor and the highest existing rade within existing grade within the foundation <br /> the foundation or 10 feet,whiche r is less. EQUALS Defined building height <br /> EQUALS Defined building height <br /> Lot Coverage:: SF <br /> Shoreland District NI• D Permit Received Averag- akeshore Setback Bluff <br /> ■ Yes 0 No 0 N/A 0 Yes 0 No <br /> 0 Yes 0 No w 0 Yes ■ o 0 N/A <br /> Permit Number: Setback: <br /> Hardcover:Zone, Existing Proposed Variance Require. CUP Required <br /> 0-75' 0 Yes 0 No 0 Yes 0 No <br /> 75-2 •' • Type(s): Type(s): <br /> 1-500' <br /> 500-1000' <br /> REMARKS (in-house): N'b C/SY74•evC <br /> Updated: 09/11/2009 <br /> `! <br /> • z:\forms\plan review checklist.docx <br />